ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: October 15, 2007Permit type: Demolition or move p | Permit status: Completed | Completion date: November 8, 2007 | Current use: Single family dwelling | Permit id: 466999 | |||||
Electrical permit Date: August 7, 2007Permit status: Issued | Current use: Single family dwelling | Permit id: 462161 | |||||
Electrical permit Date: January 16, 2008Permit status: Finaled | Completion date: June 16, 2008 | Current use: Single family dwelling | Permit id: 475925 | |||||
Rebuild Date: October 15, 2007 Value: $514,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 466996 | |||||
Abandongas service in accordance with washington gas plan no. 713207. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 1, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 355287 | |||||
Dw permit and roof drain permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. Mcdot standard: mc 301. 03. Work shall be completed as directed by the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. A permit from state of maryland forest, park and wildlife services is required for tree removal and/or planting of any trees on improved rights of way prior to driveway construction. House drain: install a roof drain within the county right of way with the following conditions: curb face will be saw cut to accept a maximum 4" diameter pvc drainage pipe. Concrete epoxy non shrink grout will be used to patch the cut curb face and above the drainpipe. Roof drain will be connected into the county storm drain structure or pipe if directed by the dps inspector. Date: October 15, 2007Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 254818 | |||||
On loring ct (house #6715) install gas service in accordance with washington gas plan no. 69200. Construct utility pavement patch in kind as directed by the inspector in the field. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: January 15, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 256069 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: August 23, 2016Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 769255 |