Four 4 ton gas packs and 1 glycol chiller, ductwork, gas piping, structural details attached, Date: March 6, 2015Permit type: Intake | Permit status: Closed | Completion date: March 5, 2015 | Permit id: 2014-255136-000 | |||||
Sani & storm: approx 115ft of 18in vsp public combo sewer main, approx. D=unk, in n russell st. Contr to provide new 6 connection from property to main with storm wye connection to branch @ curb w/cleanout. Contr to verify depth/location/proper slope in the field. Ref bes detail p-257 & p-262. Date: February 13, 2015Permit type: Intake | Permit status: Closed | Completion date: February 13, 2015 | Permit id: 2015-119364-000 | |||||
Approval of exterior alterations to the existing building located in the central city plan district, per the approved plans, exhibits c-1 through c-13, signed and dated september 22, 2014, subject to the following conditions:a. As part of the building permit application submittal, the following development-related conditions (b through c) must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 14-168151 dz. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. No electrical conduit (for lights or signs) may be exposed on the faade. C. No field changes allowed. Date: September 25, 2014Permit type: Land use review | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 2014-168151-000 | |||||
Approval of two new make-up air units and two new rooftop condensers on the southern flat portion of the existing roof of the existing building in the north albina subdistrict of the central city plan district, per the approved site plans, exhibits c-1 through c-7, signed and dated 01/28/2016, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-7. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-265279 dz. No field changes allowed. Date: February 1, 2016Permit type: Land use review | Permit status: Completed | Completion date: November 20, 2015 | Permit id: 2015-265279-000 | |||||
Revision to add 7 inch b vent through roof (for boiler on separate permit) and 6 inch roof steam vent with 3 cfm fan for boil kettle Date: October 16, 2015Permit type: Intake | Permit status: Closed | Completion date: October 16, 2015 | Permit id: 2014-255136-Rev | |||||
Ti for new tap room and brewery Date: March 25, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 26, 2015 | Permit id: 2015-140244-000 | |||||
Approval of two new make-up air units and two new rooftop condensers on the southern flat portion of the existing roof of the existing building in the north albina subdistrict of the central city plan district, per the approved site plans, exhibits c-1 through c-7, signed and dated 01 28 2016, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-7. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-265279 dz. No field changes allowed. Date: February 1, 2016Permit type: Land use review | Permit status: Completed | Completion date: November 20, 2015 | Permit id: 2015-265279-000 | |||||
Sani & storm: approx 115ft of 18in vsp public combo sewer main, approx. D=unk, in n russell st. Contr to provide new 6 connection from property to main with storm wye connection to branch @ curb w cleanout. Contr to verify depth location proper slope in the field. Ref bes detail p-257 & p-262. Date: February 13, 2015Permit type: Intake | Permit status: Closed | Completion date: February 13, 2015 | Permit id: 2015-119364-000 |