ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Existing residential reaplcement - same size, same locationn - heat pump & air handler Date: June 18, 2014Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 677102 | |||||
Solar thermal collectors Date: July 9, 2010 Value: $9,200Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 543036 | |||||
Install gas service in accordance with washington gas plan no. 685284. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: July 12, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 353262 | |||||
Under the pavement cut moratorium until 11/30/15. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Install gas service in accordance with washington gas plan no. 278093. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning Date: April 8, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 310535 |