ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: March 29, 2013Permit type: Demolition or move p | Permit status: Finaled | Completion date: May 31, 2013 | Current use: Single family dwelling | Permit id: 628532 | |||||
New residential heating/cooling hvac systems and ductwork Date: August 30, 2013Permit type: Mechanical permit | Permit status: Finaled | Completion date: January 24, 2014 | Current use: Single family dwelling | Permit id: 647127 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: July 25, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 643328 | |||||
Demolition/rebuild Date: April 25, 2013 Value: $300,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 628770 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install gas service in accordance with washington gas plan no. 175186. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: June 14, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 294749 | |||||
Dw permit (residential)remove existing driveway. Construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md
|