ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Location: sacramento ave at 8th st. Install by directional bore (3) 1. 25" hdpe conduits with trace wire. Conduits from existing qwest mh to union pacific right of way. Approximate distance 75. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: July 20, 2007Permit id: 07-0721 |