ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Deck Date: October 11, 2005Permit status: Closed | Permit id: 05-04163 | |||||
Deck Value: $4,800Client: Deck For Grout | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 05-04163 | Parcel: 26878 | |||||
Rear deck; in accordance with udo, sec. 7-10-2. (f) (3) decks, steps, uncovered porches, patios, and terraces may encroach into a required side or rear setback, but no closer than six feet to the side or rear property line. Swr ; october 11, 2005 8:35:53 am sbrank rear deck, residential.; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; free standing deck construction. Building comments: refer to the plan review comments attached to the approved drawings for important information or corrections for compliance with the building code. The approved plans and review comments are required to be kept on the jobsite for viewing by the city inspectors. The building permit is required to be posted on the Permit type: Permits - historical | Permit status: Closed | Permit id: 05-04163 | Parcel: 26878 | |||||
Deck Date: October 11, 2005 Value: $4,800Client: Deck For Grout | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 05-04163 | Parcel: 26878 | |||||
Rear deck; in accordance with udo, sec. 7-10-2. (f) (3) decks, steps, uncovered porches, patios, and terraces may encroach into a required side or rear setback, but no closer than six feet to the side or rear property line. Swr ; october 11, 2005 8:35:53 am sbrank rear deck, residential.; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; free standing deck construction. Building comments: refer to the plan review comments attached to the approved drawings for important information or corrections for compliance with the building code. The approved plans and review comments are required to be kept on the jobsite for viewing by the city inspectors. The building permit is required to be posted on the Date: October 11, 2005Permit type: Permits - historical | Permit status: Closed | Permit id: 05-04163 | Parcel: 26878 |