ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo / rebuild Date: September 30, 2014Permit type: Demolition or move p | Permit status: Finaled | Completion date: December 15, 2014 | Current use: Single family dwelling | Permit id: 682671 | |||||
Electrical permit Date: April 16, 2003Permit status: Issued | Current use: Single family dwelling | Permit id: 302978 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: July 11, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: July 15, 2014 | Current use: Single family dwelling | Permit id: 680212 | |||||
Mechanical permit Date: November 21, 2014Permit status: Finaled | Completion date: April 23, 2015 | Current use: Single family dwelling | Permit id: 695433 | |||||
Shed 140-sqft. Minimum property line setbacks in feet: rear-5, side-5 and maximum height-20. Date: June 2, 2009 Value: $3,300Permit type: Building residential | Permit status: Issued | Current use: Shed | Permit id: 512921 | |||||
Rebuild Date: September 30, 2014 Value: $875,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 682672 | |||||
Heavy up , pepco Date: February 17, 2010Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 530959 | |||||
Install gas service in accordance with washington gas plan no. 397054. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 29, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 323609 | |||||
Dw permit (residential) construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications. Install a private drainage connection within the county right of way. Concrete epoxy non? Shrink grout will be used to patch the drainpipe. Drain pipe will be connected into the county storm drain structure or pipe as directed by the dps inspector. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and Date: September 30, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 319986 |