ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Replace electric heated door and operator Date: September 12, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: September 25, 2014 | Permit id: 2013-204098-000 | |||||
Replace 2 existing mixers and circuits with new Date: March 4, 2014Permit type: Electrical inspections | Permit status: Appr w/corr | Completion date: September 25, 2014 | Permit id: 2014-122811-000 | |||||
Tenant improvement for new frozen noodle tenant, remove portions of existing slab for plumbing piping for new noodle equipment, new walls to create noodle and topping rooms and create space for new equipment, addition of fence to rear of property to enclose slab for new equipment, includes associated site work such as upgrades to accessible parking Date: November 24, 2015Permit type: Application | Permit status: Approved | Completion date: August 13, 2015 | Permit id: 2015-217429-000 | |||||
Dfs for imp walls and ceiling panels Permit type: Application | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Issuance/intake | Permit status: Intake | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Process management | Permit status: Closed | Completion date: March 14, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Life safety | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Structural | Permit status: Approved | Completion date: March 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Structural | Permit status: Not reqd | Completion date: March 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Issuance | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Application | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Issuance/intake | Permit status: Intake | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Process management | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Planning and zoning | Permit status: Not reqd | Completion date: February 2, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Erosion control | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Life safety | Permit status: Approved | Completion date: February 8, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Fire bureau | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Transportation | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Water bureau review | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Parks bureau | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Application | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 10, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Process management | Permit status: Closed | Completion date: March 11, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Life safety | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Structural | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Structural | Permit status: Required | Completion date: April 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Special inspections review | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Value added revision for platform and equipment support structures in the main building Date: March 15, 2016Permit type: Application | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2015-217429-Rev | |||||
10k, 9k, 8. 4k & 6. 6k cfm make up air units, 2 type i hoods and 4 type ii hoods, misc supply/exhaust fans for barometric balance, gas piping, plans w/co Date: November 24, 2015Permit type: Intake | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217430-000 | |||||
Construct new 1,2 sf, pre-fab metal building for waste water treatment facility on site, includes stormwater treatment facility swale and new parking lot applicant chooses option #1 per metal building requiremtn packet Date: November 24, 2015Permit type: Application | Permit status: Approved | Completion date: August 13, 2015 | Permit id: 2015-217433-000 | |||||
Value added revision for platform and equipment support structures Date: March 15, 2016Permit type: Application | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2015-217433-Rev | |||||
Hvac for new single pass make up air unit, heat only and exhaust fan for new wastewater treatment facility building, plans w/co Date: November 24, 2015Permit type: Intake | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217438-000 | |||||
Tenant improvement change of manufacturing process electrical related to this project Date: October 9, 2015Permit type: Intake | Permit status: Closed | Completion date: September 25, 2015 | Permit id: 2015-242182-000 | |||||
Land use compatibility statement for development of a new wastewater treatment building, parking lot, and storm drain treatment facilities for production of frozen noodles. Permit type: Land use review | Permit status: Closed | Completion date: September 25, 2015 | Permit id: 2015-242283-000 | |||||
Land use compatibility statement for development of a new wastewater treatment building, parking lot, and storm drain treatment facilities for production of frozen noodles. Permit type: Land use review | Permit status: Letter sent | Completion date: October 7, 2015 | Permit id: 2015-242283-000 | |||||
Remodel existing food processing plant to new product. Install new pt fixtures./ refund request routed to co inspections 3/2/2016 / Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: November 10, 2015 | Permit id: 2015-263179-000 | |||||
Cabling Date: December 2, 2015Permit type: Intake | Permit status: Closed | Completion date: December 2, 2015 | Permit id: 2015-271774-000 | |||||
Alarm-replace existing digital alarm communicator Date: December 31, 2015Permit type: Intake | Permit status: Approved | Completion date: December 31, 2015 | Permit id: 2015-283732-000 | |||||
Aes radio installation Date: January 7, 2016Permit type: Intake | Permit status: Closed | Completion date: January 7, 2016 | Permit id: 2016-101624-000 | |||||
Fixed system - hook up factory piped ansul system into type i hood Date: March 1, 2016Permit type: Intake | Permit status: Approved | Completion date: February 16, 2016 | Permit id: 2016-121278-000 | |||||
Alarm - replace existing system (one for one) and add additional notification applications to meet current code Date: March 10, 2016Permit type: Intake | Permit status: Approved | Completion date: February 17, 2016 | Permit id: 2016-121655-000 | |||||
Sprinklers & u/g-add and relocate sprinkler for remodel Date: February 19, 2016Permit type: Intake | Permit status: Approved | Completion date: February 18, 2016 | Permit id: 2016-122659-000 | |||||
Install new refrigeration equipment and relocate some existing equipment. Replace piping. Date: April 5, 2016Permit type: Intake | Permit status: Closed | Completion date: March 18, 2016 | Permit id: 2016-123521-000 | |||||
Add to existing irrigation system Date: February 22, 2016Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-124197-000 | |||||
Stormwater (572 l. F.), sanitary (3 l. F.), catch basins (4), water service (1 l. F.) and sample vault. Date: March 2, 2016Permit type: Intake | Permit status: Closed | Completion date: March 2, 2016 | Permit id: 2016-129304-000 | |||||
Fixed system - install fixed wet chem fire system in type i hood covering a kajiwara griddle Permit type: Intake | Permit status: Approved | Completion date: March 18, 2016 | Permit id: 2016-137580-000 | |||||
Fixed system - install fixed wet chem fire system in type i hood covering a kajiwara griddle Permit type: Intake | Permit status: Closed | Completion date: March 18, 2016 | Permit id: 2016-137580-000 | |||||
Alarm-install ammonia detectors in ammonia use areas of the plant. Process signal through engine room plc and send signal to fire alarm system per attached document. Permit type: Intake | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140248-000 | |||||
Alarm-install ammonia detectors in ammonia use areas of the plant. Process signal through engine room plc and send signal to fire alarm system per attached document. Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140248-000 | |||||
Install 4 individual pin mounted letters on the north elevation 3. 33x14 Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146926-000 | |||||
Install 4 individual pin mounted letters on the north elevation 3. 33x14 Permit type: Trade permits | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2016-146926-000 | |||||
Install 4 individual pin mounted letters on the north elevation 3. 33x14 Permit type: Trade permits | Permit status: Not reqd | Completion date: April 15, 2016 | Permit id: 2016-146926-000 | |||||
Install new non illuminated freestanding sign on the north elevation Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146931-000 | |||||
Install new non illuminated freestanding sign on the north elevation Permit type: Trade permits | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2016-146931-000 | |||||
Install new non illuminated freestanding sign on the north elevation Permit type: Trade permits | Permit status: Not reqd | Completion date: April 15, 2016 | Permit id: 2016-146931-000 | |||||
Alteration to exterior wall at south elevation to add new (normally locked) double doors for equipment transfer only, remove interior non bearing walls in oven area Date: August 18, 2015Permit type: Application | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2015-197119-000 | |||||
Dfs for imp walls and ceiling panels Permit type: Application | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Issuance/intake | Permit status: Intake | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Process management | Permit status: Closed | Completion date: March 14, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Life safety | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Structural | Permit status: Approved | Completion date: March 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Structural | Permit status: Not reqd | Completion date: March 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for imp walls and ceiling panels Permit type: Issuance | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Application | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Issuance/intake | Permit status: Intake | Completion date: January 28, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Process management | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Planning and zoning | Permit status: Not reqd | Completion date: February 2, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Erosion control | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Life safety | Permit status: Approved | Completion date: February 8, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Fire bureau | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Transportation | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Water bureau review | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs-bicycle canopy Permit type: Parks bureau | Permit status: Not reqd | Completion date: February 1, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Application | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 10, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Process management | Permit status: Closed | Completion date: March 11, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Life safety | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Structural | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Structural | Permit status: Required | Completion date: April 5, 2016 | Permit id: 2015-217429-Dfs | |||||
Dfs for freezer installed inside building. Not a walk in, part of the production process for noodles. Permit type: Special inspections review | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2015-217429-Dfs | |||||
10k, 9k, 8. 4k & 6. 6k cfm make up air units, 2 type i hoods and 4 type ii hoods, misc supply exhaust fans for barometric balance, gas piping, plans w co Date: November 24, 2015Permit type: Intake | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217430-000 | |||||
Hvac for new single pass make up air unit, heat only and exhaust fan for new wastewater treatment facility building, plans w co Date: November 24, 2015Permit type: Intake | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217438-000 | |||||
Land use compatibility statement for development of a new wastewater treatment building, parking lot, and storm drain treatment facilities for production of frozen noodles. Permit type: Land use review | Permit status: Closed | Completion date: September 25, 2015 | Permit id: 2015-242283-000 | |||||
Land use compatibility statement for development of a new wastewater treatment building, parking lot, and storm drain treatment facilities for production of frozen noodles. Permit type: Land use review | Permit status: Letter sent | Completion date: October 7, 2015 | Permit id: 2015-242283-000 | |||||
Remodel existing food processing plant to new product. Install new pt fixtures. Refund request routed to co inspections 3 2 2016 Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: November 10, 2015 | Permit id: 2015-263179-000 | |||||
Sprinklers & u g-add and relocate sprinkler for remodel Date: February 19, 2016Permit type: Intake | Permit status: Approved | Completion date: February 18, 2016 | Permit id: 2016-122659-000 | |||||
Fixed system - install fixed wet chem fire system in type i hood covering a kajiwara griddle Permit type: Intake | Permit status: Approved | Completion date: March 18, 2016 | Permit id: 2016-137580-000 | |||||
Fixed system - install fixed wet chem fire system in type i hood covering a kajiwara griddle Permit type: Intake | Permit status: Closed | Completion date: March 18, 2016 | Permit id: 2016-137580-000 | |||||
Alarm-install ammonia detectors in ammonia use areas of the plant. Process signal through engine room plc and send signal to fire alarm system per attached document. Permit type: Intake | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140248-000 | |||||
Alarm-install ammonia detectors in ammonia use areas of the plant. Process signal through engine room plc and send signal to fire alarm system per attached document. Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140248-000 | |||||
Install 4 individual pin mounted letters on the north elevation 3. 33x14 Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146926-000 | |||||
Install 4 individual pin mounted letters on the north elevation 3. 33x14 Permit type: Trade permits | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2016-146926-000 | |||||
Install 4 individual pin mounted letters on the north elevation 3. 33x14 Permit type: Trade permits | Permit status: Not reqd | Completion date: April 15, 2016 | Permit id: 2016-146926-000 | |||||
Install new non illuminated freestanding sign on the north elevation Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146931-000 | |||||
Install new non illuminated freestanding sign on the north elevation Permit type: Trade permits | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2016-146931-000 | |||||
Install new non illuminated freestanding sign on the north elevation Permit type: Trade permits | Permit status: Not reqd | Completion date: April 15, 2016 | Permit id: 2016-146931-000 | |||||
Demo existing driveway off marine dr and build a new driveway at bybee lake rd Date: January 9, 2002Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Under inspection | Current use: Business | Permit id: 2001-167660-000 | |||||
New racking and modify existing racking for food storage Date: October 7, 2009Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: January 21, 2010 | Current use: Factory/industrial | Permit id: 2009-152094-000 | |||||
Interior partition walls to create "scaling" room, three compartment sink Date: April 28, 2010Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: July 7, 2010 | Current use: Business | Permit id: 2010-110250-000 |