ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Skogman retaining wall Date: October 9, 2008Permit status: Closed | Permit id: 08-05662 | |||||
Skogman retaining wall Value: $6,500Client: Skogman Retaining Wall | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 08-05662 | Parcel: 22709 | |||||
October 1, 2008 3:34:25 pm cbeavers. Replacing retaining walls and patio; received application and site plans. October 2, 2008 4:25:37 pm sdecker.; gave application and site plans to john gavin for review. October 2, 2008 4:26:03 pm sdecker.; to request residential inspections call redacted phone number: building comments: refer to your approved plans and plan review checklist for written comments regarding code-related issues or corrections. The approved plans and review comments shall be maintained at the jobsite for all inspections. Inspectors need to see your plans when making their inspections. The permit is required to be posted at the jobsite at all times in a conspicuous weathertight location or container that is accessible to the city inspectors. Any new footings are required to be inspected and approved by the building inspector before the concrete is placed. Setbacks along street right of ways must be measured from Permit type: Res: accessory structure | Permit status: Closed | Permit id: 08-05662 | Parcel: 22709 | |||||
Skogman retaining wall Date: October 9, 2008 Value: $6,500Client: Skogman Retaining Wall | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 08-05662 | Parcel: 22709 | |||||
October 1, 2008 3:34:25 pm cbeavers. Replacing retaining walls and patio; received application and site plans. October 2, 2008 4:25:37 pm sdecker.; gave application and site plans to john gavin for review. October 2, 2008 4:26:03 pm sdecker.; to request residential inspections call redacted phone number: building comments: refer to your approved plans and plan review checklist for written comments regarding code-related issues or corrections. The approved plans and review comments shall be maintained at the jobsite for all inspections. Inspectors need to see your plans when making their inspections. The permit is required to be posted at the jobsite at all times in a conspicuous weathertight location or container that is accessible to the city inspectors. Any new footings are required to be inspected and approved by the building inspector before the concrete is placed. Setbacks along street right of ways must be measured from Date: October 9, 2008Permit type: Res: accessory structure | Permit status: Closed | Permit id: 08-05662 | Parcel: 22709 |