ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo/rebuild bond tracking ps13a61731 Date: May 10, 2013Permit type: Demolition or move p | Permit status: Finaled | Completion date: July 31, 2014 | Current use: Single family dwelling | Permit id: 619703 | |||||
Mechanical permit Date: August 30, 2013Permit status: Finaled | Completion date: June 23, 2014 | Current use: Single family dwelling | Permit id: 647304 | |||||
Rebuild Date: May 10, 2013 Value: $200,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 619708 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: May 29, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 636630 | |||||
Install gas service in accordance with washington gas plan no. 207154. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruct Date: October 15, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 301424 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree division permission
|