ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: December 29, 2014Permit type: Demolition or move p | Permit status: Finaled | Completion date: February 24, 2015 | Current use: Single family dwelling | Permit id: 694421 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: August 21, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: March 20, 2015 | Current use: Single family dwelling | Permit id: 685020 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: March 23, 2015Permit type: Electrical permit | Permit status: Finaled | Completion date: July 28, 2015 | Current use: Single family dwelling | Permit id: 706696 | |||||
Mechanical permit Date: April 3, 2015Permit status: Finaled | Completion date: July 28, 2015 | Current use: Single family dwelling | Permit id: 707974 | |||||
Demolition/rebuild Date: December 29, 2014 Value: $205,000Permit type: Building residential | Permit status: Finaled | Completion date: July 28, 2015 | Current use: Single family dwelling | Permit id: 694423 | |||||
Abandon and install gas service in accordance with washington gas plan no. 423073. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 24, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 325772 | |||||
Construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: December 29, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 325446 |