ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Three direct push borings are planned. Slotted pvc will be temporarily placed in the borings for collection of groundwater samples. Drilling equipment will be decontaminated between each boring. Upon completion of the direct push borings, all well completion and sampling materials will be removed and the borings will be plugged using a bentonite slurry and sealed to surface to match existing grade. Date: June 13, 2016 Contractor: Tom Sherman; Bill WhittyClient: Tom Sherman | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600259 |