ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: November 5, 2013Permit status: Finaled | Completion date: July 3, 2014 | Current use: Single family dwelling | Permit id: 653886 | |||||
Addition Date: August 2, 2013 Value: $150,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 640363 | |||||
150amp temporary pole service Date: September 4, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 647637 | |||||
Replacegas service in accordance with washington gas plan no. 226755. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have precons Date: November 18, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 304090 | |||||
Install gas service in accordance with washington gas plan no. 243613. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruct Date: December 17, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 305873 |