ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: December 5, 2013Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 657195 | |||||
Generator Date: December 19, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: March 9, 2015 | Current use: Single family dwelling | Permit id: 695853 | |||||
Existing residential replacement - same size, same location Date: March 28, 2014Permit type: Mechanical permit | Permit status: Finaled | Completion date: May 6, 2014 | Current use: Single family dwelling | Permit id: 667133 | |||||
Electrical permit Date: March 25, 2009Permit status: Issued | Current use: Single family dwelling | Permit id: 507614 | |||||
Install gas service in accordance with washington gas plan no. 113453. Work shall comply with the current montgomery county specifications for utility construction permit. Complete restoration shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Pre-construction meeting required contact mcdps inspector before and after installation. Date: August 6, 2010Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 266295 |