ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: January 15, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 700754 | |||||
540566 Date: December 21, 2010Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 557304 | |||||
Electrical permit Date: June 3, 2011Permit status: Finaled | Current use: Single family dwelling | Permit id: 570198 | |||||
20kw/100amp generator. Date: August 17, 2011Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 577276 | |||||
Fire restoration Date: October 14, 2010Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 551802 | |||||
Restore and repair - fire damage, foundations Date: July 7, 2010 Value: $675,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 540566 | |||||
Garage revision submit corrected house location survey 4-21-11 Date: March 18, 2011 Value: $14,400Permit type: Building residential permit | Permit status: Finaled | Current use: Garage | Permit id: 563536 | |||||
Underground heavy-up from 200a to 400a ; install cable and associated equipment in accordance with pepco plan no. 3472222. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: January 21, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 327991 |