ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
<< apt # 4r adjust the thermostate for the boiler so that hot water for the entire apt. Will be at city limit. Remove all work rela Date: May 15, 2015Permit type: Gc | Permit id: Ef20790 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: April 20, 2015Permit type: Delead | Permit id: Ef19462 | |||||
Perform total lead analysis of 18 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: December 16, 2014Permit type: Delead | Permit id: Ef11678 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: March 23, 2015Permit type: Delead | Permit id: Ef17439 | |||||
As per the requirement contract with hpd, provide and install 3 window guards and repair 1 throughout entire apartment 4r. Remove all work related de Date: December 10, 2014Permit type: Gc | Permit id: Ef09412 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: May 14, 2015Permit type: Delead | Permit id: Ef20651 | |||||
Make all necessary repairs to restore #2 oil boiler to p. W. O. And restore hot water to building. Remove all work related debris. Contractor Date: June 15, 2015Permit type: Heat | Permit id: Ef22116 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 6, 2014Permit type: Delead | Permit id: Ef03981 |