Mechanical permit Date: April 30, 2012Permit status: Finaled | Completion date: May 9, 2012 | Current use: Single family dwelling | Permit id: 597588 | |||||
Repairgas service in accordance with washington gas plan no. 154373. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: November 1, 2012Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 282554 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Repair gas service in accordance with washington gas plan no. 162611. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: April 24, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 292042 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Repair on main ,5x4 feet cut ,install gas service in accordance with washington gas plan no. 168287. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county
|