ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild cash bond ps14a79572 Date: June 27, 2014Permit type: Demolition or move p | Permit status: Finaled | Completion date: July 16, 2014 | Current use: Single family dwelling | Permit id: 665969 | |||||
Electrical permit Date: September 11, 2014Permit status: Finaled | Completion date: October 22, 2015 | Current use: Single family dwelling | Permit id: 687454 | |||||
Rebuild Date: July 7, 2014 Value: $600,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 667290 | |||||
Install riser and cable to provide 400amp underground service to a new single family home in accordance with pepco plan no. 3463861. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 21, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 326275 | |||||
Install gas service in accordance with washington gas plan no. 403793. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 18, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 324854 | |||||
Dw permit (residential) remove existing driveway and construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications within lot line. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: June 23, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 312706 |