ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Remodel (convert e-basement) to include new bath and two rooms __ iq-- comment--per jeff eldredge roll finaling of dormer permit onto this permit applicant came in to find out about a permit for a change in an existing baring wall and finishing the existing basement for habitable space. Gave him the following information. 1. Min. Submittal req. For an interior remodel and converting a basement to habitable space. 2. Gave him general notes for converting a basement 3. Conversion of basement guideline. When i did a permit search on the house i found a permit from 1972 for a dormer on the second floor. The permit card says the dormer was completed without inspection and is "unapproved". There were drawings in the microfilm of the dormer addition. Gave applicant jeff eldrege and larry pamer phone number to see how to get a final inspection for the dormer. Since the applicant will be coming back for a permit on the basement and main floor is there a way to add the dormer to this permit. Date: June 7, 2006Client: Southwest Neighborhoods, Inc. | Permit type: Interior alteration only | Permit status: Final | Completion date: August 24, 2006 | Current use: Single family dwelling | Permit id: 2006-136299-000 | |||||
Approximately 117 sf addition for kitchen expansion; single level add fixture for dw loop vent 10 25 11 other fixtures covered on pt 11-184332 permit per j sisk Date: September 20, 2011Client: Southwest Neighborhoods, Inc. | Permit type: Addition | Permit status: Final | Completion date: January 13, 2012 | Current use: Single family dwelling | Permit id: 2011-176298-000 |