ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Teich residence pv system - ap #683838 13. 47 kw system, 49 modules, 2-60 w inverters, accumulator w/ 2- amp breakers, 1 amp disconnect w/ amp fuses connected ahead of mcb. Date: September 4, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: September 22, 2014 | Current use: Single family dwelling | Permit id: 685761 | |||||
Solar panel installations - 49 panels 13. 4 kw capacity Date: August 29, 2014 Value: $53,206Permit type: Building residential | Permit status: Stop work | Completion date: September 22, 2014 | Current use: Single family dwelling | Permit id: 683838 | |||||
Solar panel installations - 49 panels 13. 4 kw capacity Date: August 29, 2014 Value: $53,206Permit type: Building residential permit | Permit status: Stop work | Current use: Single family dwelling | Permit id: 683838 | |||||
Electrical permit Date: November 13, 2012Permit status: Finaled | Current use: Single family dwelling | Permit id: 617526 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Teich residence pv system - ap #683838 13. 47 kw system, 49 modules, 2-60 w inverters, accumulator w/ 2- amp breakers, 1 amp disconnect w/ amp fuses connected ahead of mcb. Date: September 4, 2014Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 685761 | |||||
Macadam cut---abandon 1/2" plastic stub 19 ew bw of 6013 & 15 sn curb of valerian lane,install gas service in accordance with washington gas plan no. 695306. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 6, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354746 |