Install new 2 amp meter main on ne corner of house. Refeed 6 circuits from existing fuse box using existing fuse box as a j-box Date: June 22, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-189978-000 | |||||
New single family residence / 2 story / attached garage / flat lot / complex. See 14-141424-rs for demo. Date: June 4, 2014Permit type: Application | Permit status: Approved | Completion date: April 11, 2014 | Permit id: 2014-139367-000 | |||||
San conn only: 308 lf of 8 vsp public combo main, (approx d=10), in se raymond st. Contractor shall connect to existing capped branch at curb from demo per std p-262 (approx l=18 and d=8) 15 from us smh (acj433). Contractor to verify all depths and locations in field. Contact x37869 Date: June 23, 2014Permit type: Intake | Permit status: Closed | Completion date: June 23, 2014 | Permit id: 2014-173311-000 | |||||
New single family residence 2 story attached garage flat lot complex. See 14-141424-rs for demo. Date: June 4, 2014Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: December 2, 2014 | Current use: Single family dwelling | Permit id: 2014-139367-000 | |||||
Demo single family residence with basement. Fill basment. Remove all debis. Septic decommissioning required. Call for inspection 842. Date: April 16, 2014Client: Southeast Uplift Neighborhood Program | Permit type: Demolition | Permit status: Final | Completion date: May 30, 2014 | Current use: Single family dwelling | Permit id: 2014-141424-000 |