ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Brower subdivision Client: Subdivision | Permit type: Major subdivision | Permit status: Withdrawn | Current use: Subdivision | Permit id: 00-60000007pz | |||||
Vance gap road (2 lots) Client: Rezoning | Permit type: Rezoning | Permit status: Under review | Current use: Non development | Permit id: 01-50000028pz | |||||
Comment date: thu apr 03 00:00: est 2003 - stand alone grading; lots 5 & 6; comment date: fri apr 11 00:00: edt 2003 - grading approved. Planning h Client: Vance Gap Forest Estate I | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 03-01391 | Parcel: 476198 | |||||
Vance gap road (peter brower) Client: Minor Subdivision | Permit type: Minor subdivision | Permit status: Approved | Current use: Subdivision | Permit id: 03-61000026pz | |||||
Comment date: tue may 04 00:00: edt 2004 - commercial grading for fire truck turn around in vance gap forest i;scc; comment date: tue may 25 00:00: edt 2004 - 1. Site must stay in compliance with all f Client: Fire Truck Turnaround | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 04-02028 | Parcel: 476118 | |||||
Comment date: tue may 04 00:00: edt 2004 - commercial grading and driveway for entrance at highland gate in vance gap forest estates ii;scc; comment date: tue may 11 00:00: edt 2004 - 1. Driveway must Client: Highland Gate | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 04-02029 | Parcel: 476198 | |||||
Vance gap road (vance gap forest) Client: Recombination | Permit type: Minor subdivision | Permit status: Approved | Current use: Subdivision | Permit id: 04-61000154pz | |||||
Stand alone grading; lots 5 & 6; grading approved. Planning has approved the minor subdivision of 9 lots. Silt fence & mud mat were not shown on the plan but are required. Slopes should not exceed a 2:1 slope. If fill is brought in & placed on site, the inspector needs to know where it is coming from & whether a permit was acquired for that site as well. If the inspector feels there is a problem arising from the work being done, he will require additional erosion control measures. Make sure the silt fence & mud mat stay fresh at all times & no erosion escapes your site. Call mark tiller at redacted phone number for an inspection once erosion control measrues are in place. Ars 4/11/03 Permit type: Planning - historical | Permit status: Closed | Permit id: 03-01391 | Parcel: 476198 | |||||
Commercial grading for fire truck turn around in vance gap forest i;scc; 1. Site must stay in compliance with all federal, state and l ocal regulations. If site falls out of compliance for any o f the agencys stated above, the project stands the chance o f having a notice of violation issued against the project t o shutting down the job and retracting the approval for thel and disturbance. Please stay in compliance. 2 . If any of the minimum best management practices fail to ad equately keep sedimentation or stormwater on the site, it sh all be the responsibility of the professional designer of re cord to supply the contractor/owner with a correction, as we ll as submit correction to the stormwater/erosion control of fice for approval. 3. Slopes that exceed 2:1, require a engineer design for s tability. 4 . Inspector assigned to this project is sarah owenby an d she can be reached at redacted phone number (office) or 77 7-4833 (cell). The inspector must be called when the er osion control Permit type: Planning - historical | Permit status: Closed | Permit id: 04-02028 | Parcel: 476118 | |||||
Commercial grading and driveway for entrance at highland gate in vance gap forest estates ii;scc; 1. Driveway must be located at least 5 from property line. 2. Entrance apron for driveway access shall be constructed of concrete or asphalt. 3. Driveway access apron must be constructed in accordance with detail 3. 15 from the city of asheville standard specifications manual. (sent to applicant) 4. Inspector must be called 48 hours prior to pouring of the driveway access apron for an inspection of the forms. 5. Inspector for this project is mark tiller and he can be reached at redacted phone number (office) or redacted phone number (cell). 6. Total width cannot exceed 25 wide at the edge of the roadway. This measurement includes the radius. 7. Radius must be no greater than 42 (3. 5 feet). 8. There will be one entrance constructed. 9. Culvert may be required for positive drainage across the property. Use 18 cmp.; 1. Site must stay in compliance with all federal, state and l ocal regulations. If sit Permit type: Planning - historical | Permit status: Closed | Permit id: 04-02029 | Parcel: 476198 | |||||
Brower subdivision Date: October 2, 2000Client: Subdivision | Permit type: Major subdivision | Permit status: Withdrawn | Current use: Subdivision | Permit id: 00-60000007pz | |||||
Vance gap road (2 lots) Date: October 1, 2001Client: Rezoning | Permit type: Rezoning | Permit status: Under review | Current use: Non development | Permit id: 01-50000028pz | |||||
Stand alone grading; lots 5 & 6; comment date: fri apr 11 00:00: edt 2003 - grading approved. Planning h Date: January 10, 2012Client: Vance Gap Forest Estate I | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 03-01391 | Parcel: 476198 | |||||
Vance gap road (peter brower) Date: February 24, 2003Client: Minor Subdivision | Permit type: Minor subdivision | Permit status: Approved | Current use: Subdivision | Permit id: 03-61000026pz | |||||
Commercial grading for fire truck turn around in vance gap forest i;scc; comment date: tue may 25 00:00: edt 2004 - 1. Site must stay in compliance with all f Date: January 10, 2012Client: Fire Truck Turnaround | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 04-02028 | Parcel: 476118 | |||||
Commercial grading and driveway for entrance at highland gate in vance gap forest estates ii;scc; comment date: tue may 11 00:00: edt 2004 - 1. Driveway must Date: January 10, 2012Client: Highland Gate | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 04-02029 | Parcel: 476198 | |||||
Vance gap road (vance gap forest) Date: September 23, 2004Client: Recombination | Permit type: Minor subdivision | Permit status: Approved | Current use: Subdivision | Permit id: 04-61000154pz | |||||
Stand alone grading; lots 5 & 6; grading approved. Planning has approved the minor subdivision of 9 lots. Silt fence & mud mat were not shown on the plan but are required. Slopes should not exceed a 2:1 slope. If fill is brought in & placed on site, the inspector needs to know where it is coming from & whether a permit was acquired for that site as well. If the inspector feels there is a problem arising from the work being done, he will require additional erosion control measures. Make sure the silt fence & mud mat stay fresh at all times & no erosion escapes your site. Call mark tiller at redacted phone number for an inspection once erosion control measrues are in place. Ars 4 11 03 Date: January 10, 2012Permit type: Planning - historical | Permit status: Closed | Permit id: 03-01391 | Parcel: 476198 | |||||
Commercial grading for fire truck turn around in vance gap forest i;scc; 1. Site must stay in compliance with all federal, state and l ocal regulations. If site falls out of compliance for any o f the agencys stated above, the project stands the chance o f having a notice of violation issued against the project t o shutting down the job and retracting the approval for thel and disturbance. Please stay in compliance. 2 . If any of the minimum best management practices fail to ad equately keep sedimentation or stormwater on the site, it sh all be the responsibility of the professional designer of re cord to supply the contractor owner with a correction, as we ll as submit correction to the stormwater erosion control of fice for approval. 3. Slopes that exceed 2:1, require a engineer design for s tability. 4 . Inspector assigned to this project is sarah owenby an d she can be reached at redacted phone number (office) or 77 7-4833 (cell). The inspector must be called when the er osion control Date: January 10, 2012Permit type: Planning - historical | Permit status: Closed | Permit id: 04-02028 | Parcel: 476118 | |||||
Commercial grading and driveway for entrance at highland gate in vance gap forest estates ii;scc; 1. Driveway must be located at least 5 from property line. 2. Entrance apron for driveway access shall be constructed of concrete or asphalt. 3. Driveway access apron must be constructed in accordance with detail 3. 15 from the city of asheville standard specifications manual. (sent to applicant) 4. Inspector must be called 48 hours prior to pouring of the driveway access apron for an inspection of the forms. 5. Inspector for this project is mark tiller and he can be reached at redacted phone number (office) or redacted phone number (cell). 6. Total width cannot exceed 25 wide at the edge of the roadway. This measurement includes the radius. 7. Radius must be no greater than 42 (3. 5 feet). 8. There will be one entrance constructed. 9. Culvert may be required for positive drainage across the property. Use 18 cmp.; 1. Site must stay in compliance with all federal, state and l ocal regulations. If sit Date: January 10, 2012Permit type: Planning - historical | Permit status: Closed | Permit id: 04-02029 | Parcel: 476198 |