ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
On rolling knoll ct (house #6) install 2 inch plastic gas service in accordance with washington gas plan no. 106651. Construct utility pavement patch in kind as directed by the inspector in the field. All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply with the current montgomery county specifications for utility construction permit. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector richard long at 301-370-3709 before and after installation. Date: February 9, 2010Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 264445 | |||||
Install gas service in accordance with washington gas plan no. 131785. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: August 11, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 270824 |