ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
( apt # 2d ) at pvt. Hall => properly repair the broken / defective ceiling ( approx 12 sq. Ft.). Demo and repair with sheetrock, tape, compound , pr Date: September 9, 2011Permit type: Gc | Permit id: Ec06557 | |||||
( apt # 2d ) at pvt. Hall => properly repair the broken defective ceiling ( approx 12 sq. Ft.). Demo and repair with sheetrock, tape, compound , pr Date: September 9, 2011Permit type: Gc | Permit id: Ec06557 | |||||
As per rc # 2007001218401 (enviro-probe inc), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: March 7, 2007Permit type: Delead | Permit id: E723694 | |||||
Replace with new the broken lower sash window glass in bed room (nw-1). Remove all work related debries. Note: contractor must contact hpd @ 718-802 Date: February 12, 2008Permit type: Gc | Permit id: E821140 | |||||
Apartment #2b: disconnect existing gas lines to stove and ceiling lghts,install new gas stove line to stove to include gas cock and flex hose obta Date: May 15, 2006Permit type: Plumb | Permit id: E632183 | |||||
As per requirement contract apt 1d supply andinstall 1 window guard complete at entire apartent. Remove all work related debris contract Permit type: Gc | Permit id: Ed13431 | |||||
As per requirement contract apt 1d supply andinstall 1 window guard complete at entire apartent. Remove all work related debris contract Permit type: Gc | Permit id: Ed13431 | |||||
As per requirement contract apt 1d supply andinstall 1 window guard complete at entire apartent. Remove all work related debris contract Permit type: Gc | Permit id: Ed13431 | |||||
As per requirement contract apt 1d supply andinstall 1 window guard complete at entire apartent. Remove all work related debris contract Permit type: Gc | Permit id: Ed13431 | |||||
As per requirement contract apt 1d supply andinstall 1 window guard complete at entire apartent. Remove all work related debris contract Permit type: Gc | Permit id: Ed13431 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 26, 2010Permit type: Delead | Permit id: Eb04769 | |||||
Apt 1b) at front room, replace window balances on both sides to lower thermal sash. Remove all work related debris. Note: contractor must con Date: April 24, 2007Permit type: Gc | Permit id: E728108 | |||||
Apt #2c) at kitchen : repair (1, screws only) window guard. Total = 1. Remove all work related debris. Mini rc omo #k903908. Note: contractor m Date: March 23, 2009Permit type: Gc | Permit id: E931199 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Permit type: Delead | Permit id: E914184 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Permit type: Delead | Permit id: E914184 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Permit type: Delead | Permit id: E914184 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Permit type: Delead | Permit id: E914184 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Permit type: Delead | Permit id: E914184 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 15, 2012Permit type: Delead | Permit id: Ed10022 | |||||
(apt #2a) replace (3) broken and defective lower sash windows glass at bedrooms. At apt entrance: replace (1) broken door mortise lock set. Remove a Date: December 4, 2007Permit type: Gc | Permit id: E813669 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 5, 2012Permit type: Delead | Permit id: Ed11482 | |||||
As per requirement contract with hpd. (apt#2a) supply and install total (2) new window guards as follows: kitchen (1), bathroom (1). Rep Date: December 19, 2012Permit type: Gc | Permit id: Ed11895 | |||||
Replace with new the broken lower sash window glass at east wall in room n-1. Remove all work related debries. Note: contractor must contact hpd @ Date: February 12, 2008Permit type: Gc | Permit id: E821142 | |||||
As per rc # 2006001274404 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: September 14, 2006Permit type: Delead | Permit id: E707868 | |||||
(apt #3c) at bedroom: square-off defective plywood floor (approx. 32 sq. Ft.). Provide sub flooring for tiles. Provide and install same on equal vi Date: December 5, 2007Permit type: Gc | Permit id: E813670 | |||||
As per rc #2005001338404 (enviro-probe inc), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: August 10, 2005Permit type: Delead | Permit id: E604353 | |||||
Apt #3c) at entire apartment: install (3) set of window stops, and at room north-1 install (1) window guard complete. Remove all work related debris Permit type: Gc | Permit id: E816144 | |||||
(apt. #3c) supply and install a new apartment entrance door and buck, include all hardware. Remove all work related debris. Contractor must sign Date: October 22, 2004Permit type: Gc | Permit id: E510415 | |||||
As per rc # 2006001274404 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: July 25, 2006Permit type: Delead | Permit id: E702058 | |||||
Apartment #3c replace with new the defective window balances in (a) livingroom windows (b) bedroom 1 window make necessary adjustments for proper f Date: May 11, 2007Permit type: Gc | Permit id: E729600 | |||||
Apt #3c) at entire apartment: install (3) set of window stops, and at room north-1 install (1) window guard complete. Remove all work related debris Permit type: Gc | Permit id: E816144 | |||||
Apt #3c) at entire apartment: install (3) set of window stops, and at room north-1 install (1) window guard complete. Remove all work related debris Permit type: Gc | Permit id: E816144 | |||||
Apt #3c) at entire apartment: install (3) set of window stops, and at room north-1 install (1) window guard complete. Remove all work related debris Permit type: Gc | Permit id: E816144 | |||||
Apt #3c) at entire apartment: install (3) set of window stops, and at room north-1 install (1) window guard complete. Remove all work related debris Permit type: Gc | Permit id: E816144 | |||||
As per rc #20010012859 (emsl), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method u Date: March 17, 2008Permit type: Delead | Permit id: E825470 | |||||
Trace, locate and repair the water leak from above apartment. Supply and install new sheetrocks at ceiling. Total of sq. Ft. Remove all working deb Date: January 25, 2008Permit type: Gc | Permit id: E818947 | |||||
As per rc #2005001338404 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: September 13, 2005Permit type: Delead | Permit id: E607540 | |||||
Trace, locate and repair the water leak from above apartment. Supply and install new sheet rocks at ceiling. Total of sq. Ft. Tape compound prime Date: March 12, 2008Permit type: Gc | Permit id: E818948 | |||||
Perform total lead analysis of 01 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 10, 2008Permit type: Delead | Permit id: E909675 | |||||
Repair with similar material the broken ceramic floor tiles in the bathroom of apartment 1a. Match the ceramic tile design. Remove all working related Date: January 14, 2008Permit type: Gc | Permit id: E818950 | |||||
Apt #1a) trace and repair source of water leak. At bathroom: north wall: 25 sq. Ft., east wall sq. Ft., west wall 7 sq. Ft., south wall 15 sq. Ft. Date: October 2, 2007Permit type: Gc | Permit id: E807692 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 18, 2008Permit type: Delead | Permit id: E820046 | |||||
As per rc #200400467901 (enviro-probe, inc.), perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: May 10, 2004Permit type: Delead | Permit id: E422964 | |||||
Apt #3a) at kitchen window: replace with new the broken upper sash pane, and at 2nd room window: replace with new the broken upper sash glass pane. R Date: December 21, 2007Permit type: Gc | Permit id: E815683 | |||||
As per rc #20010012859 (emsl), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method u Date: March 17, 2008Permit type: Delead | Permit id: E825472 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 25, 2008Permit type: Delead | Permit id: E820756 | |||||
Perform total lead analysis of 01 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 10, 2008Permit type: Delead | Permit id: E909676 | |||||
Replace with new the upper sash glass pane window in the kitchen and second room from north at west(nw2). Remove all working related debries. Note: Date: January 28, 2008Permit type: Gc | Permit id: E819124 | |||||
(apt. #53a) at kitchen: trace and repair source of water leak and loose plaster above bathroom. At kitchen: north wall: sq. Ft., east wall sq Date: February 20, 2008Permit type: Gc | Permit id: E816988 | |||||
(apt. #4c) make all necessary repairs to the cold water supply at kitchen and bathroom. Remove all work related debris. Contractor must sign and Date: April 16, 2007Permit type: Plumb | Permit id: E727476 | |||||
Apartment #4c second (2nd) lower window sash in bedroom, install glass pane. Thermal window. Remove all work related debris. Note: contractor m Date: February 5, 2007Permit type: Gc | Permit id: E720675 | |||||
As per rc #2006001274404 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: August 25, 2006Permit type: Delead | Permit id: E706131 | |||||
Apartment #4c: repair wood floor at kitchen approx 25 sq ft. Level floor install 3/4 plywood and v. C. Tiles 25 sq. Ft. Remove all work related debri Date: February 5, 2007Permit type: Gc | Permit id: E720683 | |||||
Apartment #4c: repair wood floor at kitchen approx 25 sq ft. Level floor install 3 4 plywood and v. C. Tiles 25 sq. Ft. Remove all work related debri Date: February 5, 2007Permit type: Gc | Permit id: E720683 | |||||
As per rc #2004000522201 (enviro-probe inc), perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: April 8, 2004Permit type: Delead | Permit id: E420955 | |||||
As per rc # 2006001274404 (enviro-probe inc), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: July 25, 2006Permit type: Delead | Permit id: E702061 | |||||
Apt. # 1c location - house gasline make all necessary repairs to the broken / defective / leaky house gasline to apartment # 1c. Vendor has to c Permit type: Plumb | Permit id: Eb30453 | |||||
As per rc # 20080000809 (eastern analyt. Svc.,inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8 Date: October 25, 2007Permit type: Delead | Permit id: E810388 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 24, 2011Permit type: Delead | Permit id: Ec04064 | |||||
(apt. #1c) trace and repair the source of loose plaster above the bathroom of apt. 1c xrf tested ceiling and surrounding walls tested mixed. Provid Date: October 12, 2007Permit type: Gc | Permit id: E808273 | |||||
(apt #1c ) at kitchen => replace with new the broken / defective lower sash glass pane. Return window to proper working condition. Non- Date: August 9, 2011Permit type: Gc | Permit id: Ec04181 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 30, 2011Permit type: Delead | Permit id: Ec06068 | |||||
Apartment #1c properly repair with similar material the broken wood floor including supply and install sun floor 3/4 plywood and vinyl composition t Date: April 16, 2007Permit type: Gc | Permit id: E727114 | |||||
Apt. # 1c location - house gasline make all necessary repairs to the broken / defective / leaky house gasline to apartment # 1c. Vendor has to c Permit type: Plumb | Permit id: Eb30453 | |||||
Apt. # 1c location - house gasline make all necessary repairs to the broken / defective / leaky house gasline to apartment # 1c. Vendor has to c Permit type: Plumb | Permit id: Eb30453 | |||||
Apartment #1c properly repair with similar material the broken wood floor including supply and install sun floor 3 4 plywood and vinyl composition t Date: April 16, 2007Permit type: Gc | Permit id: E727114 | |||||
(apt #1c ) at kitchen => replace with new the broken defective lower sash glass pane. Return window to proper working condition. Non- Date: August 9, 2011Permit type: Gc | Permit id: Ec04181 | |||||
Apt. # 1c location - house gasline make all necessary repairs to the broken defective leaky house gasline to apartment # 1c. Vendor has to c Permit type: Plumb | Permit id: Eb30453 | |||||
Apt. # 1c location - house gasline make all necessary repairs to the broken defective leaky house gasline to apartment # 1c. Vendor has to c Permit type: Plumb | Permit id: Eb30453 | |||||
Public area: supply and install a new marble tread at vestibule first (1st) tread up from bottom. Remove all work related debris. Note: contracto Date: February 15, 2007Permit type: Gc | Permit id: E721831 | |||||
P/h:- intermediating landing between 4th & 5th stories supply and install (1) number of marble slab at the intermediating landing between 4th & 5th Permit type: Gc | Permit id: E918717 | |||||
P/h: intermediate landing b/w 4th & 5yh stories: remove existing defective window at the p/h & install complete new aluminum replacement window bri Date: December 14, 2008Permit type: Gc | Permit id: E918919 | |||||
At public hall 4th fl itermediate landing: replace the broken marble platform with new approx 16 sqft. At 4th fl: replace the broken marble tread 1 Date: January 6, 2009Permit type: Gc | Permit id: E921142 | |||||
Public area: replace with new the broken lower sash glass pane at first (1st) story intermediate landing. Remove all work related debris. Note: c Date: April 13, 2007Permit type: Gc | Permit id: E727130 | |||||
At public hall 1st story: cover the exposed electrical wires at wall with similar material to existing approx 6 sqft. Remove all work related debris Date: January 7, 2009Permit type: Elec | Permit id: E921139 | |||||
(public area lobby) install a new flourescent light fixture to replace the existing damaged one above mail boxes. And restore to replace working orde Date: June 9, 2006Permit type: Elec | Permit id: E636029 | |||||
(public area) remove approx. Cubic yards of rubbish at the rear court yard and west fire passageway. Contractor must sign and return with bi Date: March 3, 2004Permit type: Gc | Permit id: E417616 | |||||
P/h:- intermediating landing between 4th & 5th stories supply and install (1) marble slab at the intermediating landing between 4th & 5th stories. A Date: December 17, 2008Permit type: Gc | Permit id: E918953 | |||||
(public area) replace with new the broken upper sash window wired glass pane at the 1st story intermediate landing at public hall stairs. Remove all Date: November 13, 2006Permit type: Gc | Permit id: E712806 | |||||
Public area) trace and repair source of concealed water leak affecting vestibule ceiling at 1st story public hallway. Restore damaged plaster ceil Date: July 25, 2007Permit type: Gc | Permit id: E802199 | |||||
Public area : at 4th story public hall stair : replace broken marble tread at 1st from bottom, and replace missing marble platform approx. 12. 25 sq. Ft Date: February 5, 2009Permit type: Gc | Permit id: E924939 | |||||
Public hall 6-floor install 1- iron angle support bracket. #6-up, 6-floor intermediate landing. Public hall stairs. Date: March 30, 2012Permit type: Gc | Permit id: Ec26024 | |||||
(1)supply and install steel vestibule door includes,door closer,standard hardware,piano hinge,lockset and restoration. (2)replace with new the defe Date: February 8, 2008Permit type: Gc | Permit id: E821112 | |||||
Replace with new the defective and missing 2nd ,4th and 5th metal tread up from bottom at fire passageway stairs to building front yard. Remove all wo Date: February 12, 2008Permit type: Gc | Permit id: E821138 | |||||
At public hall between 1st. & 2nd. Flr. #3 & 5 stops install new metal pan & marble treads. Total of (2) remove work related debris! Note: contra Date: December 14, 2004Permit type: Gc | Permit id: E514777 | |||||
Public area : at 4th story intermediate landing, public hall stair : replace brick to brick aluminum window, including caulking, casing stops, stool a Date: February 9, 2009Permit type: Gc | Permit id: E924935 | |||||
4th story public hallway stairs: replace broken marble tread, 2nd from bottom. Vendor scope notes: remove all work related debris. Date: February 9, 2009Permit type: Gc | Permit id: E925468 | |||||
Remove the accumulation of cu. Yard of refuse ,rubbish and wastage of construction material in open space at west side fire passage way and buildi Date: February 4, 2008Permit type: Gc | Permit id: E821139 | |||||
Supply and install h. M. Door for bulkhead from 5th story public hall to roof including frame,standard hardware,self closing hinges and lockset.(18ga Date: February 15, 2008Permit type: Gc | Permit id: E821622 | |||||
Repair window guard in apt. 1c kitchen : install window stops. Date: November 28, 2011 Value: $67Permit type: Gc | Permit id: Ec13731 | |||||
Apt: 2a install window stops at existing window guard at window at kitchen, bedroom 1 and 2 or a total of 3. Date: October 6, 2011 Value: $68Permit type: Gc | Permit id: Ec09329 | |||||
Apt. 3b: bedroom1: reinstall 1 window guard Date: September 13, 2010 Value: $27Permit type: Gc | Permit id: Eb09647 | |||||
Install window guard with all necessaryone way screws and window stops in the second room from north at west. Window size: 34x30. Remove all working Date: January 11, 2008 Value: $59Permit type: Gc | Permit id: E819134 | |||||
Install window guard with all the necessary one way screws and window stops in the first room from north, at east (ne1), apt 3a. Remove all working re Date: January 11, 2008 Value: $29Permit type: Gc | Permit id: E819101 | |||||
Install one window guard complete at south wall window in bed room (n-3) including all necessary window guard, window stops and one way screws. Remove Date: January 29, 2008 Value: $40Permit type: Gc | Permit id: E821143 | |||||
Adjust thermostate at required temperature. Ensure that adequate hot water available at all hot water fixtures in apartment #5b. Note: contractor mu Date: January 22, 2008 Value: $99Permit type: Heat | Permit id: E820266 | |||||
Replace with new the missing or defective window guard , one window guard in bed room (nw-1) and one window guard in bed room (ne-1) including all nec Date: January 19, 2008 Value: $59Permit type: Gc | Permit id: E820103 | |||||
Demolish and repair the broken ceiling sq. Ft. Using gypsum wall board 5/8 thick on ceiling, attached to joists, fire resistant or water resistant, Date: January 19, 2008Permit type: Gc | Permit id: E820102 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 19, 2008Permit type: Delead | Permit id: E820100 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: July 24, 2006Permit type: Delead | Permit id: E702085 | |||||
(apt.#1b) 1st. Room install (1) window guard. Date: December 22, 2004 Value: $28Permit type: Gc | Permit id: E515999 | |||||
Erp ll/ 38violation:as per attached scope of work. Rc # thoroughly remove all lead violations as per new york city health code section 173. 14 and as n Date: April 23, 2004 Value: $315Permit type: Delead | Permit id: E422484 | |||||
(apt. 4a) at kitchen reinstall (1) window guard complete. At bathroom install stops at window guard. Remove all work related debris. Date: November 19, 2003 Value: $85Permit type: Gc | Permit id: E409196 | |||||
( apt #4a) install guard and stop. Date: June 12, 2003 Value: $86Permit type: Gc | Permit id: E324799 | |||||
Public area: at 3rd. Story re-install (2) top and bottom sash. Date: May 1, 2003Permit type: Gc | Permit id: E321652 | |||||
Erp ll/ 38violation:as per attached scope of work. Rc # thoroughly remove all lead violations as per new york city health code section 173. 14 and as n Date: January 13, 2003 Value: $211Permit type: Delead | Permit id: E313234 | |||||
P/a : remove inner lower glass pane between 2nd and 3rd floor intermediate landing , bring it shop for repair and install. Date: September 11, 2000Permit type: Gc | Permit id: E104845 | |||||
P/h:- intermediating landing between 4th & 5th stories supply and install (1) number of marble slab at the intermediating landing between 4th & 5th Permit type: Gc | Permit id: E918717 | |||||
P/h:- intermediating landing between 4th & 5th stories supply and install (1) number of marble slab at the intermediating landing between 4th & 5th Permit type: Gc | Permit id: E918717 | |||||
P a : remove inner lower glass pane between 2nd and 3rd floor intermediate landing , bring it shop for repair and install. Date: September 11, 2000Permit type: Gc | Permit id: E104845 | |||||
Erp ll 38violation:as per attached scope of work. Rc # thoroughly remove all lead violations as per new york city health code section 173. 14 and as n Date: January 13, 2003 Value: $211Permit type: Delead | Permit id: E313234 | |||||
Erp ll 38violation:as per attached scope of work. Rc # thoroughly remove all lead violations as per new york city health code section 173. 14 and as n Date: April 23, 2004 Value: $315Permit type: Delead | Permit id: E422484 | |||||
Demolish and repair the broken ceiling sq. Ft. Using gypsum wall board 5 8 thick on ceiling, attached to joists, fire resistant or water resistant, Date: January 19, 2008Permit type: Gc | Permit id: E820102 | |||||
P h:- intermediating landing between 4th & 5th stories supply and install (1) marble slab at the intermediating landing between 4th & 5th stories. A Date: December 17, 2008Permit type: Gc | Permit id: E918953 | |||||
P h:- intermediating landing between 4th & 5th stories supply and install (1) number of marble slab at the intermediating landing between 4th & 5th Permit type: Gc | Permit id: E918717 | |||||
P h: intermediate landing b w 4th & 5yh stories: remove existing defective window at the p h & install complete new aluminum replacement window bri Date: December 14, 2008Permit type: Gc | Permit id: E918919 | |||||
P h:- intermediating landing between 4th & 5th stories supply and install (1) number of marble slab at the intermediating landing between 4th & 5th Permit type: Gc | Permit id: E918717 | |||||
As per rc #2004000522201 (enviro-probe inc), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: May 4, 2004Permit type: Delead | Permit id: E423108 | |||||
As per rc #20010012859 (emsl), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method u Date: March 17, 2008Permit type: Delead | Permit id: E826241 | |||||
As per rc #2003002573101 (international asb test lab), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) Date: September 23, 2003Permit type: Delead | Permit id: E405173 | |||||
As per rc #20020011883 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: February 3, 2003Permit type: Delead | Permit id: E314638 | |||||
Apt #5b) at room north east-i : install (1) window guard. Total =1. Remove all work related debris. Mini rc omo #k903908. Note: contractor must Date: March 19, 2009Permit type: Gc | Permit id: E931198 | |||||
As per rc #2003002573101 (international asb test lab), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) Date: September 12, 2003Permit type: Delead | Permit id: E404526 | |||||
As per the requirement contract with hpd. Apartment: 4a supply and install the missing or repair/replace the defective window guard(s) throughou Date: March 17, 2014Permit type: Gc | Permit id: Ee18182 | |||||
At bathroom :- trace, stop and repair the source of concealed water leak from above apartment. Repair the broken plastered ceiling with similar mat Date: February 16, 2012Permit type: Gc | Permit id: Ec20562 | |||||
Perform total lead analysis of 13 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 7, 2012Permit type: Delead | Permit id: Ec20197 | |||||
Apt #4a) at room north east-1: trace and repair the source of water leak and loose plaster. At room north east-1: east wall 1 sq ft and ceiling 148 Date: December 17, 2007Permit type: Gc | Permit id: E814023 | |||||
Apt # 4a - private hall - repair approx 36 sq. Ft. Of ceiling. Prime and paint to cover. Remove all work related debris. Non- s. W. P. Note: cont Date: August 16, 2011Permit type: Gc | Permit id: Ec04492 | |||||
As per the requirement contract with hpd. Apartment: 4a supply and install the missing or repair replace the defective window guard(s) throughou Date: March 17, 2014Permit type: Gc | Permit id: Ee18182 |