| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical for stair relocation and ,addition of vestibule. Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-02757 | |||||
Fan Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm10-06992 | |||||
Retaining wall #1/3rd party plan rev only/bureau v Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial accessory | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pb13-03056 | |||||
Electrical Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-02182 | |||||
Gas for temporary,boiler equipment Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp11-13851 | |||||
Comm/bldg 24/add on new entrance/3rd pty plans rev only/bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-03019 | |||||
Eb/comm plant 1 bldg 56 /manufacturing finishout w/equipment installation/3rd party plans & insp/winston services Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp08-20355 | |||||
Install 9 - vent fan/duct ,system and 4 - misc equipment Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm08-06379 | |||||
East ahu 2 housekeeping pad Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-02755 | |||||
2 inch Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp09-00570 | |||||
Install 1( ton) chiller, 8 maus, ,ductwork, 1 chillwater air handler, 5 ,louvers, exhaust fans,. Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm08-05012 | |||||
Comm/bldg 24/2nd flr remodel/3rd pty plans & insp/ Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-00085 | |||||
Backflow replace qty,8 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Issued | Completion date: August 21, 2015 | Permit id: Pp11-10352 | |||||
Industrial/gen. Pad & cmu wall encl/3rd party pr & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe12-08952 | |||||
Eb/comm new concrete pad for processing lagoon/3rd party plans & insp/winston services Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb08-03916 | |||||
Bldg 26 mechanical Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pm11-06217 | |||||
Install rpz valve to existing system Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pp11-10068 | |||||
New canopy. 3rd party rvw & insp. Winston service Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe10-07783 | |||||
Cc/comm/addition to bldg #8/metal waster treatment/rev 9/15/08 add sq footage Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm09-00172 | |||||
New handicap lift and ramp. 3rd party rvw & insp winston services Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe10-07782 | |||||
Mechanical permit Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pp10-15131 | |||||
Manufactoring/new cafeteria/bldg 24/3rd party plan rev,only Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp11-10233 | |||||
Underground utilities - new office building/3rd party plan rev only Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp13-01992 | |||||
Comm inter demo plant 1 bldg #2 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pb10-09161 | |||||
Electrical remodel Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Withdrawn | Completion date: August 21, 2015 | Permit id: Pe13-06624 | |||||
Revised/cc/new shell bldg # 56 bell plant 1 /xd party plans & inspections/winston services Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp08-06166 | |||||
Plumbing Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp10-15084 | |||||
Manufacturing/bldg 24/exterior/interior demo Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-02939 | |||||
Mlh/comm/foundation & containment for hazmat tank/xd pr & insp/winston Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe10-03141 | |||||
New commercial retaining wall Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial accessory | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-05193 | |||||
Industrial/concrete pad for mechanial equipment Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-00908 | |||||
Retaining wall #2/3rd party plan rev only/bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial accessory | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-03057 | |||||
Plumbing backflow Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp09-00712 | |||||
Industrial/relocate existing stairs and add vestibule Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-00907 | |||||
Partial re-roofing Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pb11-08063 | |||||
Electrical-add motors Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-07452 | |||||
21 - selenoid valves ,31 - prox sensors,16 - motors ,rodney beckman - 817 851 9104 Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-04767 | |||||
Manufactoring/new cafeteria/bldg 24/3rd party plan rev,only / electrical remodel Date: August 21, 2015Client: Eastgreen Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-06319 | |||||
Comm/office bldg 27/manufacturing bldg remodel/3rd party plan review only/bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb12-09823 | |||||
New maintenance bldg/bldg 12/3rd plan & insp/bv Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-01402 | |||||
Insatll hvac Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm09-06655 | |||||
Replace backflow,preventer plant 1 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp13-07553 | |||||
Bldg #2/air comp rear;split auto clave;ind water pit;v-22 auto clave;split auto clave Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp03-18966 | |||||
Ahu ducts and piping Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-02349 | |||||
Industrial/interior remodel/2nd floor & basement/3rd,party plan rev & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-08230 | |||||
Install fixtures, water service line and ,sanitary line and gas line Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp13-03697 | |||||
Office remodel b26 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp11-13849 | |||||
Site utilities sanitary sewer Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Pending | Completion date: August 21, 2015 | Permit id: Pp13-05733 | |||||
Utilities Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Pending | Completion date: August 21, 2015 | Permit id: Pp11-08683 | |||||
Install 5 miscellaneous vent stacks. Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm09-03562 | |||||
Gas repair Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pp11-09529 | |||||
Hv/comm remdodel-adding spray booth flash -off enclosure and personnel mezzannine ,stairs nad curing oven /xd plan rev only Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb09-09049 | |||||
North ahu 1 housekeeping pad. Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-02758 | |||||
Bldg 27 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp06-10043 | |||||
Comm/int remodel/adding steel/concrete mezzanine f Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-09327 | |||||
Com/ change of use with remodel/bldg 14/ aircraft hangert to factory with office/3rd pty plan review & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-05548 | |||||
Comm inter remodel -plant 1 bldg #2 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb10-09163 | |||||
Cooling tower Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-05034 | |||||
Backflow replace,wwtp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Issued | Completion date: August 21, 2015 | Permit id: Pp12-07031 | |||||
Test Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Withdrawn | Completion date: August 21, 2015 | Permit id: Pm10-06991 | |||||
Install power for mechoshade Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pe11-05135 | |||||
Bldg 26/ cooling tower Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-07254 | |||||
Putting a feeder from 250amp to 400amp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pe11-04907 | |||||
Bldg 8 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp03-16058 | |||||
Bid59/blast area Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-03825 | |||||
Industrial/manufactoring/intermodel remodel/3rd party,plan review & inspection interior demo and remodel of restroom and janitor closet Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe10-09483 | |||||
Bldg 2 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp06-10041 | |||||
Exhaust fan,vestibule Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-02337 | |||||
"21" Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pp04-00350 | |||||
Electrical for new parking lot lighting Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe12-04301 | |||||
Plumbing work Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp11-09359 | |||||
"36" Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pp04-00349 | |||||
Lot 8 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp03-16059 | |||||
Electrical remodelcomm/bldg 24/add on new entrance Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-04395 | |||||
Replace backflow Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Issued | Completion date: August 21, 2015 | Permit id: Pp11-10785 | |||||
Com/ bldg 27/ext handicap ramp/new entrance & planters Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-00315 | |||||
Plumbing remodel work Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp13-01402 | |||||
21 - selenoid valves 31 - prox sensors 16 - motors Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pe09-04766 | |||||
Mechanical remodel work Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Pending | Completion date: August 21, 2015 | Permit id: Pm13-00452 | |||||
Industrial/concrete pad for mechanical equipment Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-00909 | |||||
Cup mech upgrade and,office remodel Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-06504 | |||||
Install power to mechoshade Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pe11-05139 | |||||
Gas test Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp11-04943 | |||||
1rtu( tons), installing 8 make up air units, install duct work, exhaust fans. Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Void | Completion date: August 21, 2015 | Permit id: Pm08-05011 | |||||
Industrial/concrete pad for mechanical equipment/ ahu ducts and piping/ 06-29-2011 revised permit to add 1 fan coil and misc for piping connected to fan coil/ Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-02350 | |||||
Comm/bldg 24/window replacments/3rd pty plans & insp/bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-02254 | |||||
Electrical-disconnecting and ,raising transformer Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-04486 | |||||
Sewer 3 storm drain 300 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pp07-17002 | |||||
Add 3 exterior emergency ,lights (electrical) Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-02750 | |||||
Equipment area pad/headquarters bldg/3rd party rev only/bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Issued | Completion date: August 21, 2015 | Permit id: Pb13-04385 | |||||
Commercial fence Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial accessory structure | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-07036 | |||||
Bldg 1 Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm05-14019 | |||||
Install split ac system with ductwork. ,install unit heater, 3 exhaust fans and ,ductwork, condensate drain Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm13-01354 | |||||
Bid59/ finish area Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-03826 | |||||
Retaining wall #1 3rd party plan rev only bureau v Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial accessory structure | Permit status: Expired | Completion date: August 21, 2015 | Permit id: Pb13-03056 | |||||
Comm bldg 24 add on new entrance 3rd pty plans rev only bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-03019 | |||||
Eb comm plant 1 bldg 56 manufacturing finishout w equipment installation 3rd party plans & insp winston services Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp08-20355 | |||||
Install 9 - vent fan duct ,system and 4 - misc equipment Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm08-06379 | |||||
Comm bldg 24 2nd flr remodel 3rd pty plans & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-00085 | |||||
Industrial gen. Pad & cmu wall encl 3rd party pr & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe12-08952 | |||||
Eb comm new concrete pad for processing lagoon 3rd party plans & insp winston services Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb08-03916 | |||||
Cc comm addition to bldg #8 metal waster treatment rev 9 15 08 add sq footage Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm09-00172 | |||||
Manufactoring new cafeteria bldg 24 3rd party plan rev,only Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp11-10233 | |||||
Underground utilities - new office building 3rd party plan rev only Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp13-01992 | |||||
Revised cc new shell bldg # 56 bell plant 1 xd party plans & inspections winston services Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp08-06166 | |||||
Manufacturing bldg 24 exterior interior demo Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-02939 | |||||
Mlh comm foundation & containment for hazmat tank xd pr & insp winston Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe10-03141 | |||||
Industrial concrete pad for mechanial equipment Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-00908 | |||||
Retaining wall #2 3rd party plan rev only bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial accessory structure | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-03057 | |||||
Industrial relocate existing stairs and add vestibule Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-00907 | |||||
Manufactoring new cafeteria bldg 24 3rd party plan rev,only electrical remodel Date: August 21, 2015Client: Eastgreen Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-06319 | |||||
Comm office bldg 27 manufacturing bldg remodel 3rd party plan review only bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb12-09823 | |||||
New maintenance bldg bldg 12 3rd plan & insp bv Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-01402 | |||||
Bldg #2 air comp rear;split auto clave;ind water pit;v-22 auto clave;split auto clave Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Plumbing backflow | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pp03-18966 | |||||
Industrial interior remodel 2nd floor & basement 3rd,party plan rev & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-08230 | |||||
Hv comm remdodel-adding spray booth flash -off enclosure and personnel mezzannine ,stairs nad curing oven xd plan rev only Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb09-09049 | |||||
Comm int remodel adding steel concrete mezzanine f Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-09327 | |||||
Com change of use with remodel bldg 14 aircraft hangert to factory with office 3rd pty plan review & insp Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-05548 | |||||
Bldg 26 cooling tower Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-07254 | |||||
Bid59 blast area Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-03825 | |||||
Industrial manufactoring intermodel remodel 3rd party,plan review & inspection interior demo and remodel of restroom and janitor closet Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe10-09483 | |||||
Electrical remodelcomm bldg 24 add on new entrance Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe11-04395 | |||||
Com bldg 27 ext handicap ramp new entrance & planters Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb13-00315 | |||||
Equipment area pad headquarters bldg 3rd party rev only bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Issued | Completion date: August 21, 2015 | Permit id: Pb13-04385 | |||||
Industrial concrete pad for mechanical equipment ahu ducts and piping 06-29-2011 revised permit to add 1 fan coil and misc for piping connected to fan coil Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Mechanical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pm11-02350 | |||||
Bid59 finish area Date: August 21, 2015Client: Bell Helicopter Inc % Division Of Textron Inc | Permit type: Electrical | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pe09-03826 | |||||
Comm bldg 24 window replacments 3rd pty plans & insp bureau veritas Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-02254 | |||||
Industrial concrete pad for mechanical equipment Date: August 21, 2015Client: Bell Helicopter Inc | Permit type: Commercial building permit | Permit status: Finaled | Completion date: August 21, 2015 | Permit id: Pb11-00909 |