ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Sidewalk deposit during construction. This is not a permit to excavate occupy or install driveway openings - separate permits and approvals are required. Deposit will be held until all construction is complete and the site is in walk-away condition. Upon written request a pwd engineer will inspect the restored public way to verify the completed work meets city and ada standards. [ sidewalk slope 2% or less] permit: 60. Inspection:; 200. 00; deposit:; 7 000. 00; Date: October 18, 2016Permit type: Sidewalk deposit | Permit id: Sdep-647979 |