ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Place, splice and test aerial/buried fiber optic cable facilities in accordance with verizon plan no. 8a03135 customer r ordered fios. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row Date: July 24, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 297523 | |||||
Demolition or move p Date: August 31, 2012Permit status: Finaled | Completion date: July 31, 2013 | Current use: Single family dwelling | Permit id: 607700 | |||||
New unit Date: November 23, 2012Permit type: Mechanical permit | Permit status: Finaled | Completion date: July 8, 2013 | Current use: Single family dwelling | Permit id: 618469 | |||||
1 amp temp. Pole service for construction. Date: July 6, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 604053 | |||||
Demo/rebuild Date: September 11, 2012 Value: $450,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 607699 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree division permission
|