ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt 4e................. Install (1) window guard throught-out apartment. Date: March 14, 2016Permit type: Gc | Permit id: Eg14679 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: April 11, 2013 Value: $1,058Permit type: Delead | Permit id: Ed20350 | |||||
Apt #1g) at bathroom : trace, locate and repair all leaks, coming down over the bathtub. Restore the ceiling with new g. W. B. Approx. 4x6. Tape, co Date: May 7, 2009Permit type: Gc | Permit id: E937768 | |||||
At apt. 4b, 4th story------east 3 room replace with new the broken glass pane on top sash at window to the fire escape approx. 30x30, also replac Date: November 10, 2015Permit type: Gc | Permit id: Eg06588 | |||||
At apt #5e, bathroom ----- tenant contact # (347) 442-0072 entire bathroom--- abate mold and mildew growth with soap or detergent and water Date: July 6, 2015Permit type: Gc | Permit id: Ef22991 | |||||
Apt: 5e >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> at the bathroom abate mold and mildew growth with soap or detergent and water (no bleach or biocide Date: January 6, 2015Permit type: Gc | Permit id: Ef12587 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 23, 2013Permit type: Delead | Permit id: Ed21083 | |||||
Apt 6f: as per the requirement contract with hpd, provide and install 1 window guard throughout entire apartment. Remove all work related debris. Date: June 21, 2013Permit type: Gc | Permit id: Ed24863 | |||||
>>>>>>>>>>>> building aka 57 st. Pauls place at apt # 6f >>>>>>>>>>>>>>> 1. At roof over the apt # 6f make proper repair (approx area 2 sq. Ft. Date: June 19, 2014Permit type: Gc | Permit id: Ee25930 |