ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Andrews residence/ pv system--no electrical application submitted Date: August 20, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 725124 | |||||
Install (13) solar panels to sfd roof Date: August 20, 2015 Value: $16,250Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 719261 | |||||
Electrical permit Date: July 27, 2011Permit status: Finaled | Current use: Single family dwelling | Permit id: 575568 | |||||
Building permit:561864 Date: August 16, 2011Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 577180 | |||||
Addition too large for fasttrack Date: April 27, 2011 Value: $270,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 561864 | |||||
Replacegas service in accordance with washington gas plan no. 299414. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 15, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 313887 |