ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: July 24, 2013Permit status: Finaled | Current use: Single family dwelling | Permit id: 643008 | |||||
Residential - demo/rebuild - new 400amp residential service and one 17kw 65amps generator Date: November 20, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 655581 | |||||
New unit Date: November 21, 2013Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 655767 | |||||
Shed less than 144 sq ft Date: April 17, 2000 Value: $300Permit type: Building residential permit | Permit status: Issued | Current use: Shed | Permit id: 216675 | |||||
Demo / rebuild Date: September 16, 2013 Value: $350,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 640975 | |||||
Bore roadway; dig and backfill trench for new 400a urd in pepco trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3426914. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 19, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 303926 | |||||
Dw permit (residential) remove existing driveway. Construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree
|