| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition or move p Date: August 25, 2000Permit status: Completed | Completion date: July 21, 2006 | Current use: Single family dwelling | Permit id: 222826 | |||||
Electrical permit Date: February 26, 2001Permit status: Finaled | Completion date: July 2, 2001 | Current use: Single family dwelling | Permit id: 241443 | |||||
Demo permit must be issued first Date: August 30, 2000 Value: $150,000Permit type: Building residential | Permit status: Finaled | Completion date: July 2, 2001 | Current use: Single family dwelling | Permit id: 222824 | |||||
Build 52 conduit to cut roadway, excavate sidewalk, resurface and associated equipment. Plan no. 5701694 no pavement cut is allowed. Bore road crossing. Date: February 5, 2001Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 210067 | |||||
Construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 1-23b Date: July 14, 2000Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 205805 | |||||
Place, splice and test buried fiber optic cable facilities in accordance with verizon plan no. 8a02581. Work shall comply with the current montgomery county specifications for utility construction permit. Backfill test pits and complete restoration shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: September 17, 2010Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 266807 |