Install stormwater treatment system as required by 1200-z industrial stormwater permit; install 2. 25 acre of asphalt pavement; install 5 new catch basins and conveyance pipes; covered fuel station under separate permit Permit type: Application | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-195904-000 | |||||
Install stormwater treatment system as required by 1200-z industrial stormwater permit; install 2. 25 acre of asphalt pavement; install 5 new catch basins and conveyance pipes; covered fuel station under separate permit Permit type: Issuance/intake | Permit status: Intake | Completion date: July 2, 2015 | Permit id: 2015-195904-000 | |||||
Install stormwater treatment system as required by 1200-z industrial stormwater permit; install 2. 25 acre of asphalt pavement; install 5 new catch basins and conveyance pipes; covered fuel station under separate permit Permit type: Addressing | Permit status: Not reqd | Completion date: July 6, 2015 | Permit id: 2015-195904-000 | |||||
Modifying 12 branch circuits, adding gfcis to duplex receptacles and 2 exit signs. Date: August 5, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2015-212302-000 | |||||
Hazardous-above ground fuel tank, new canopy, two dispensor fueling site. Date: November 6, 2015Permit type: Intake | Permit status: Approved | Completion date: October 7, 2015 | Permit id: 2015-247532-000 | |||||
Storm conn: 142 of 18 csp storm only main, approx d=10, in n basin ave. Contractor shall build new std manhole over existing 18 main & build new 15 branch per std p-262 from manhole to property. Contractor to verify all depths and locations in field. Contact x37869 Date: November 9, 2015Permit type: Intake | Permit status: Closed | Completion date: November 9, 2015 | Permit id: 2015-262629-000 | |||||
A storm treatment system is being installed and required by the 1200-z industrial stormwater permit 2. 25 acre pavement, catch basins, conveyonce pipes and covered fuel station Date: November 9, 2015Permit type: Intake | Permit status: Closed | Completion date: November 9, 2015 | Permit id: 2015-262635-000 | |||||
Lucs 12 c water - see 15-195904 dr Permit type: Land use review | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-195966-000 | |||||
Lucs 12 c water - see 15-195904 dr Permit type: Land use review | Permit status: Letter sent | Completion date: July 10, 2015 | Permit id: 2015-195966-000 | |||||
Add 1 amp sub panel and 8 circuits for pump and lights Date: July 6, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2015-196616-000 | |||||
New fuel station with canopy and tank mounting slab; install stormwater treatment system as required by 1200-z industrial stormwater permit; install 2. 25 acre of asphalt pavement; install 5 new catch basins and conveyance pipes; Date: November 18, 2015Permit type: Application | Permit status: Approved | Completion date: July 9, 2015 | Permit id: 2015-198926-000 | |||||
Revise permit to change location of tree line from north border to east border of property and revise three tree species. Date: December 18, 2015Permit type: Application | Permit status: Approved | Completion date: December 17, 2015 | Permit id: 2015-198926-Rev | |||||
Lucs 12 c water - see 15-195904 dr Permit type: Land use review | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-195966-000 | |||||
Lucs 12 c water - see 15-195904 dr Permit type: Land use review | Permit status: Letter sent | Completion date: July 10, 2015 | Permit id: 2015-195966-000 | |||||
Repair concrete and steel at truck loading dock Date: May 18, 2010Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: May 28, 2010 | Current use: Storage | Permit id: 2010-138310-000 | |||||
New stormwater sampling ports to address bes concerns 11 16 20 rev detail #2 on page 2 for plmg Date: November 16, 2010Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: January 4, 2011 | Current use: Factory/industrial | Permit id: 2010-191673-000 |