Building aka: 1295 pacific street, brooklyn bulkhead door at roof level >>>>>>>>>>> properly replace with new the missing self closing fire proof doo Date: June 12, 2013Permit type: Gc | Permit id: Ed24229 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 30, 2013 Value: $1,287Permit type: Delead | Permit id: Ee05505 | |||||
Install new vct tiles appr. 3 s. F. To avoid trip hazard at public hall 3 rd story. Next to apt. 2f. At the time of this invitation to bid, it is n Date: July 12, 2013 Value: $72Permit type: Gc | Permit id: Ee00671 | |||||
Apt 3r: repair 1 window guard throughout entire apartment. Date: November 4, 2013 Value: $74Permit type: Gc | Permit id: Ee09500 | |||||
(apt#3-f) install (1) window guards complete. (1) in the living room. Repair (4) window guards with one-way screws and stop. (2) in bedroom #2, Date: October 7, 2009 Value: $14Permit type: Gc | Permit id: Ea12328 | |||||
Apt #3f) at bedroom#1: install (3) window guards and at bedroom#2 install (1) window guard. Remove all work related debris. Date: December 22, 2008Permit type: Gc | Permit id: E920394 | |||||
Public area : at public hall 3rd floor : install (1) window guard. Remove all work related debris. Date: December 22, 2008 Value: $97Permit type: Gc | Permit id: E920391 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: August 30, 2007 Value: $1,815Permit type: Delead | Permit id: E805447 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: April 4, 2006 Value: $2,574Permit type: Delead | Permit id: E629651 | |||||
P/h: replace missing cap at radiator shut off valve at 1st story public hall. Date: November 14, 2001 Value: $96Permit type: Misc | Permit id: E208608 | |||||
P h: replace missing cap at radiator shut off valve at 1st story public hall. Date: November 14, 2001 Value: $96Permit type: Misc | Permit id: E208608 | |||||
Make all necessary repairs and adjustmentsto gas fired boiler in order to provide and ensure an adequate supply of heat to the entire apt 2r. Contrac Permit type: Heat | Permit id: E919483 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: February 13, 2009Permit type: Delead | Permit id: E926927 | |||||
Make all necessary repairs and adjustmentsto gas fired boiler in order to provide and ensure an adequate supply of heat to the entire apt 2r. Contrac Permit type: Heat | Permit id: E919483 | |||||
Make all necessary repairs and adjustmentsto gas fired boiler in order to provide and ensure an adequate supply of heat to the entire apt 2r. Contrac Permit type: Heat | Permit id: E919483 | |||||
Make all necessary repairs and adjustmentsto gas fired boiler in order to provide and ensure an adequate supply of heat to the entire apt 2r. Contrac Permit type: Heat | Permit id: E919483 | |||||
Make all necessary repairs and adjustmentsto gas fired boiler in order to provide and ensure an adequate supply of heat to the entire apt 2r. Contrac Permit type: Heat | Permit id: E919483 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: May 5, 2006Permit type: Delead | Permit id: E632364 | |||||
As per the requirement contract with hpd, provide and install window guards and repair 1 window guard throughout entire apartment 3r. Remove all wo Date: November 6, 2013Permit type: Gc | Permit id: Ee09162 | |||||
(apt. #3r) restore gas heaing plant to proper working order. . Ensure adequate heat and hot water to entire building. Remove all work related debri Date: January 16, 2006Permit type: Heat | Permit id: E620911 | |||||
Apt 3f: as per the requirement contract with hpd, provide and install 4 window guards and repair 4 throughout entire apartment. Remove all work r Date: January 15, 2013Permit type: Gc | Permit id: Ed12100 | |||||
Apartment 2:remove and replace with one new double hung window in the bed room (1st room from north at east). Remove all work related debris. Date: November 19, 2010Permit type: Gc | Permit id: Eb15199 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 3, 2009Permit type: Delead | Permit id: E929129 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler to restore to proper working condition. Restore heat to entire building. Note: Date: December 31, 2008Permit type: Heat | Permit id: E917318 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 30, 2009Permit type: Delead | Permit id: E924798 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: December 13, 2013Permit type: Delead | Permit id: Ee11960 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 4, 2013Permit type: Delead | Permit id: Ee09472 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 me Date: September 21, 2007Permit type: Delead | Permit id: E807124 | |||||
Perform total lead analysis of 16 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 17, 2012Permit type: Delead | Permit id: Ec29537 | |||||
Apt 2f: as per the requirement contract with hpd, provide and install 9 window guards throughout entire apartment. Remove all work related debris Date: July 12, 2013Permit type: Gc | Permit id: Ee00455 | |||||
In apt. 2f at bathroom: repair broken ceramic tile floor with new tiles approx. S. F. Note: contractor must contact h. P. D. @ (718) 623-,99 Date: April 17, 2012Permit type: Gc | Permit id: Ec26832 | |||||
(apt#2f) trace, locate and repair water leak from above affecting bathroom and kitchen ceiling. Remove all work related debris. Contractor m Date: April 12, 2012Permit type: Gc | Permit id: Ec26831 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: September 24, 2013Permit type: Delead | Permit id: Ee07076 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845- Date: September 1, 2005Permit type: Delead | Permit id: E606590 |