ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo / rebuild bond tracking ps14a73151 Date: February 19, 2014Permit type: Demolition or move p | Permit status: Completed | Completion date: March 25, 2014 | Current use: Single family dwelling | Permit id: 646456 | |||||
Building permit# 429833 Date: August 25, 2006Permit type: Electrical permit | Permit status: Finaled | Completion date: November 1, 2006 | Current use: Single family dwelling | Permit id: 431455 | |||||
Electrical permit Date: June 3, 2014Permit status: Finaled | Completion date: December 8, 2014 | Current use: Single family dwelling | Permit id: 675143 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: June 13, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: December 8, 2014 | Current use: Single family dwelling | Permit id: 676512 | |||||
Demo / rebuild revision submitted on 2/26/14 - structural - adding finished attic level sq ft = 747; cost = 30,0 (emc) Date: February 19, 2014 Value: $300,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 646454 | |||||
Sunroom Date: August 22, 2006 Value: $56,193Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 429833 | |||||
Replace poles; dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3428600. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps
|