ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: April 15, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: January 14, 2015 | Current use: Single family dwelling | Permit id: 669518 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Please do not request inspections under this permit until 2 business days after permit issuance. Date: July 10, 2015Permit type: Electrical permit | Permit status: Finaled | Completion date: August 21, 2015 | Current use: Single family dwelling | Permit id: 719771 | |||||
Mechanical permit Date: April 2, 2014Permit status: Finaled | Completion date: January 14, 2015 | Current use: Single family dwelling | Permit id: 667859 | |||||
Demo/rebuild Date: November 27, 2013 Value: $800,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 649993 | |||||
Row restoration for whc and shc a full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused bywhc and shc construction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: May 19, 2014Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 313687 | |||||
Install gas service in accordance with washington gas plan no. 317096. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 29, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 314354 |