ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: April 28, 2016Permit type: Electrical permit | Permit status: Finaled | Current use: Street light | Permit id: 753520 | |||||
Bore roadway, (dig and backfill trench), place, splice and test aerial/buried fiber optic cable facilities in accordance with verizon plan no. 1a0bx3e. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 26, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 326229 | |||||
Sidewalk must be maintained open full width at all times. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byinstallation of temporary super silt fence. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: January 6, 2014Permit type: Public right of way | Permit status: Completed | Current use: Fence | Permit id: 306629 | |||||
Install gas service in accordance with washington gas plan no. 395133. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 23, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 323586 | |||||
Restoration of row sidewalk must be open at all time in full width to pedestrian traffic. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byinstalling of temporary construction fence. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: January 8, 2014Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 306047 |