ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Change out (2) 80k btu 90% furnace (2) 3 ton a c units - same size location. Electric and gas by others. All work done exclusively on second floor as per code. Date: January 26, 2015 Value: $5,000Expiration date: July 26, 2015 | Permit id: Com2015-01293 | |||||
Check and repair all outlets lights add proper exit lighting combos pull (8) new circuits for office lights switches outlets recept. Remove illegal wiring. All work done to code. Date: January 26, 2015 Value: $3,000Expiration date: July 26, 2015 | Permit id: Com2015-01731 | |||||
(use) use 1st fl as unoccupied retail space-office 2nd fl. Awc per planning: approved with condition that any future improvements to the property will be elevated at least to the flood protection elevation Date: June 5, 2015Permit id: Use2015-02176 | |||||
Interior demolition category 1 non-structural alterations interior work 4 sq. Ft. - remove and replace drywall multiple small and large sections. No alterations - using existing walls. Prime and paint as per code. Date: September 20, 2013 Value: $10,082Expiration date: March 20, 2014 | Permit id: Com2013-19768 | |||||
Use entire of 1st floor as a retail shop (antiques store)continue to use 2nd floor as office Date: August 3, 2017Permit id: Use2017-51862 |