ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: June 13, 2005Permit id: 05-06-130 | Parcel: 001010001000 | |||||
Date: April 3, 2006Permit id: 06-04-002 | Parcel: 014782011000 | |||||
Install 1" meter. New sfd, the rivers. Temporary water fees paid for 6 months from date of issuance. Date: June 16, 2005Permit id: 05-0974 | |||||
Install "silt fencing and or fiber roll wattles" along sidewalk and the curb to the satisfaction of the city engineer to minimize erosion from the lot onto the city right-of-way. Landscape is to be completed no later than feb. 28 2006. Date: December 28, 2005Permit id: 05-1571 | |||||
Pool-all work shall comply with city standards. Access is limited to site driveway. Soil relocation requires written permission from receiving location. A pre-inspection is required! Final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Date: April 7, 2006Permit id: 06-0201 | Parcel: 014782011000 |