ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 Misc elect & mech to install hvac for (e) sfd. Date: November 29, 2017 Contractor: Dynamic Air Systems IncPermit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 59 1) epm combo permit for interior remodel 2) 2,7 sqft re-roof 3) replacing 3 windows totaling 75 sqft (25 sqft each), replacing 2 doors totaling 9 sqft (4 sqft each) all for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material concrete tile proposed roofing material concrete tile manufacturer madera 7 brand and model winterwood blend color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 59 Res electrical meter panel upgrade 200amp Date: February 8, 2017 Contractor: S Z ElectricPermit type: Addn | Permit status: Completed | Completion date: July 10, 2017 | Permit id: Pds2017-Resalt- | |||||
- excavation permit Date: June 25, 2014Permit status: Closed | Completion date: October 1, 2014 | Permit id: Dpw2014-Rwexcp- | |||||
Building site inspection Date: February 7, 2005Permit status: Done | Permit id: Pds2005-1001-20 |