ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: January 23, 2014Permit type: Demolition or move p | Permit status: Completed | Completion date: March 28, 2014 | Current use: Single family dwelling | Permit id: 653418 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: May 15, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: October 23, 2014 | Current use: Single family dwelling | Permit id: 672930 | |||||
Electrical permit Date: June 26, 2014Permit status: Finaled | Completion date: October 20, 2014 | Current use: Single family dwelling | Permit id: 678443 | |||||
Demolition/rebuild revision submitted 1/23/14 - site only (house moved back 3-feet; drywells added, proposed water house connection added) (emc) Date: January 23, 2014 Value: $300,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 654702 | |||||
Deck Date: July 29, 2014 Value: $1,700Permit type: Building residential permit | Permit status: Finaled | Current use: Deck | Permit id: 681798 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused bywater house connection/abandonment and crane operation. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: January 3, 2014Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 306888 | |||||
Place, splice and test aerial/buried fiber optic cable facilities in accordance with verizon plan no. 8a07977,customer ordered fios. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 20, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 326447 | |||||
Dw permit (residential) construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree
|