| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(ste 102) service release for permanent meter 200a 120/208v 3 phase Date: November 23, 2015 Value: $2,000Permit id: Com2015-28144 | |||||
(ste 203) service release for permanent meter 200a 120/208v 3 phase Date: November 23, 2015 Value: $2,000Permit id: Com2015-28147 | |||||
Suite 2022 amp 120/208v 3 phase as per code. Date: November 10, 2015 Value: $2,000Permit id: Com2015-26942 | |||||
Suite 1014 amp 120/208v 3 phase as per code. Date: November 10, 2015 Value: $2,000Permit id: Com2015-26952 | |||||
Suite 2014 amp 120/208v 3 phase as per code. Date: November 10, 2015 Value: $2,000Permit id: Com2015-26955 | |||||
Exterior work -remove (1) 2 0 gallon underground storage tank formerly containing gasoline and properly backfilling using rc-6 as per code. Date: December 23, 2014 Value: $7,300Permit id: Com2014-44219 | |||||
Use premises as a new furniture store with outdoor display b3 zoning district Date: March 9, 2009Permit id: Use2008-05052 | |||||
Install gas meter as per code Date: April 6, 2016 Value: $2,100Expiration date: October 6, 2016 | Permit id: Com2016-08243 | |||||
7 low voltage drops for access control system as per code. Date: May 18, 2016 Value: $750Expiration date: November 18, 2016 | Permit id: Com2016-12989 | |||||
Amend permit: change scope of work: low voltage drops as per code.(original permit:com2016-12989:7 low voltage drops for access control system as per code. )original permit description:(com2016-12989)7 low voltage drops for access control system as per code. Date: June 1, 2016Expiration date: November 18, 2016 | Permit id: Com2016-14178 | |||||
Use 5604 york road space as a food commissary Date: June 9, 2016Permit id: Use2016-01561 | |||||
Use portion of premises space b 1st and 2nd floor as a food commissary Date: August 22, 2016Permit id: Use2016-01560 | |||||
Suite 1014 amp 120 208v 3 phase as per code. Date: November 10, 2015 Value: $2,000Expiration date: May 10, 2016 | Permit id: Com2015-26952 | |||||
Suite 2014 amp 120 208v 3 phase as per code. Date: November 10, 2015 Value: $2,000Expiration date: May 10, 2016 | Permit id: Com2015-26955 | |||||
(ste 102) service release for permanent meter 200a 120 208v 3 phase Date: November 23, 2015 Value: $2,000Expiration date: May 23, 2016 | Permit id: Com2015-28144 | |||||
(ste 203) service release for permanent meter 200a 120 208v 3 phase Date: November 23, 2015 Value: $2,000Expiration date: May 23, 2016 | Permit id: Com2015-28147 | |||||
Suite 2022 amp 120 208v 3 phase as per code. Date: November 10, 2015 Value: $2,000Expiration date: May 10, 2016 | Permit id: Com2015-26942 | |||||
Original permit description:(com2015-10592)interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls door Date: November 10, 2015Permit id: Com2015-26956 | |||||
Original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new/improved water gas Date: November 10, 2015Permit id: Com2015-26958 | |||||
Renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new/improved water gas and electrical service. New walls doors c Date: October 7, 2015 Value: $750,000Permit id: Com2015-09321 | |||||
Interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a Date: October 7, 2015 Value: $45,000Permit id: Com2015-10592 | |||||
Renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new/improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting/electrical. As per plans as per code. Date: October 7, 2015 Value: $750,000Expiration date: October 7, 2017 | Permit id: Com2015-09321 | |||||
Interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a food preparation facility) new hvac plumbing and lighting/electrical in renovated areas new unisex bathroom as per plans as per code. Separate permit required for sprinkler and fire alarm system. Date: October 7, 2015 Value: $45,000Expiration date: April 7, 2016 | Permit id: Com2015-10592 | |||||
Original permit description:(com2015-10592)interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a food preparation facility) new hvac plumbing and lighting/electrical in renovated areas new unisex bathroom as per plans as per code. Separate permit required for sprinkler and fire alarm system. Date: October 23, 2015Expiration date: April 7, 2016 | Permit id: Com2015-25243 | |||||
Original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new/improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting/electrical. As per plans as per code. Date: October 23, 2015Expiration date: October 7, 2017 | Permit id: Com2015-25247 | |||||
Original permit description:(com2015-10592)interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a food preparation facility) new hvac plumbing and lighting/electrical in renovated areas new unisex bathroom as per plans as per code. Separate permit required for sprinkler and fire alarm system. Date: February 24, 2016Expiration date: April 7, 2016 | Permit id: Com2016-04344 | |||||
Original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new/improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting/electrical. As per plans as per code. Date: February 24, 2016Expiration date: October 7, 2017 | Permit id: Com2016-04350 | |||||
Install new fire alarm system in existing remodeled building as per plans as per code. Date: April 22, 2016 Value: $30,000Expiration date: October 22, 2016 | Permit id: Com2016-01948 | |||||
Add 2 sprinkler heads largest pipe size 4" as per plans as per code. Date: May 4, 2016 Value: $47,500Expiration date: November 4, 2016 | Permit id: Com2016-05985 | |||||
Hook up and testing of 2 captiveaire core systems for kitchen hoods as per plans as per code. Date: June 7, 2016 Value: $2,000Expiration date: December 7, 2016 | Permit id: Com2016-08338 | |||||
Amend permit com2015-09321 issued on 10/07/15 with plans #2015-827 to add the following additional work: 4 backflow preventers 3" rpz domestic water and 2" rpz domestic water as per code. (original permit:com2015-09321:renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new/improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting/electrical. As per plans as per code.)original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restr Date: August 5, 2016Expiration date: October 7, 2017 | Permit id: Com2016-20134 | |||||
Renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting electrical. As per plans as per code. Date: October 7, 2015 Value: $750,000Expiration date: October 7, 2017 | Permit id: Com2015-09321 | |||||
Interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a food preparation facility) new hvac plumbing and lighting electrical in renovated areas new unisex bathroom as per plans as per code. Separate permit required for sprinkler and fire alarm system. Date: October 7, 2015 Value: $45,000Expiration date: April 7, 2016 | Permit id: Com2015-10592 | |||||
Original permit description:(com2015-10592)interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a food preparation facility) new hvac plumbing and lighting electrical in renovated areas new unisex bathroom as per plans as per code. Separate permit required for sprinkler and fire alarm system. Date: October 23, 2015Expiration date: April 7, 2016 | Permit id: Com2015-25243 | |||||
Original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting electrical. As per plans as per code. Date: October 23, 2015Expiration date: October 7, 2017 | Permit id: Com2015-25247 | |||||
Original permit description:(com2015-10592)interior tenant fit out (existing space on the 2nd story of an existing building for a commercial business) interior renovation to replace existing front windows add 1 new egress stair new interior walls doors ceilings (to create tenant space for a food preparation facility) new hvac plumbing and lighting electrical in renovated areas new unisex bathroom as per plans as per code. Separate permit required for sprinkler and fire alarm system. Date: February 24, 2016Expiration date: April 7, 2016 | Permit id: Com2016-04344 | |||||
Original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting electrical. As per plans as per code. Date: February 24, 2016Expiration date: October 7, 2017 | Permit id: Com2016-04350 | |||||
Amend permit com2015-09321 issued on 10 07 15 with plans #2015-827 to add the following additional work: 4 backflow preventers 3" rpz domestic water and 2" rpz domestic water as per code. (original permit:com2015-09321:renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting electrical. As per plans as per code.)original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restr Date: August 5, 2016Expiration date: October 7, 2017 | Permit id: Com2016-20134 | |||||
Extend original permit.(original permit:com2015-09321:renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to remain). Exterior work includes replacing existing side walls adding new egress door and creating new outdoor patio space above modified existing roof new hvac plumbing and lighting electrical. As per plans as per code.)original permit description:(com2015-09321)renovation of existing 2 story building (mixed use) tenant fit out. Renovation to include masonry repair replace existing windows add 2 new egress stairs 1 elevator and new restrooms new improved water gas and electrical service. New walls doors ceilings to create tenant spaces for business and assembly spaces (existing mercantile space to r Date: November 1, 2017Expiration date: May 1, 2018 | Permit id: Com2017-17141 | |||||
Use second floor rear as an assembly area as an accessory use (in accordance with sec. 1-302(c)(1)) to the commissary (meetings tastings private parties where food makers are members of b-more kitchen). Date: November 8, 2017Permit id: Use2017-53584 |