ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Total tear off and overlay of 22 squares with dimensional shingles. 8 12 pitch. Date: May 30, 2003 Contractor: Dennis FuhrerClient: Dennis Fuhrer,Dorothy Faustin | Applicant: Dennis Fuhrer | Permit type: Roofing | Permit status: Cmp | Completion date: December 4, 2003 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount, grid-tied, 1. 715 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: January 24, 2014 Contractor: Solarcity CorporationClient: Daniel Fredrickson,Malia Fredrickson | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 29, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount, grid-tied, 1. 715 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Daniel Fredrickson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 29, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00369 | |||||
Total tear off and overlay of 22 squares with dimensional shingles. 8 12 pitch. Date: May 30, 2003 Value: $1Client: Dennis Fuhrer | Permit type: Roofing | Permit status: Cmp | Completion date: December 4, 2003 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-02121 | |||||
Total tear off and overlay of 22 squares with dimensional shingles. 8 12 pitch. Date: May 30, 2003 Value: $1,500Client: Dennis Fuhrer | Permit type: Roofing | Permit status: Cmp | Completion date: December 4, 2003 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-02121 |