Demo bond tracking ps15a91870 Date: June 5, 2015Permit type: Demolition or move p | Permit status: Issued | Current use: Single family dwelling | Permit id: 709543 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: October 28, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: January 14, 2015 | Current use: Single family dwelling | Permit id: 692912 | |||||
Front porch Date: April 29, 2002 Value: $3,500Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 272635 | |||||
Rebuild Date: June 12, 2015 Value: $800,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 709545 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: April 13, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 751422 | |||||
Residential - geothermal heating/cooling & ductwork (w/p #723405) Date: February 4, 2016Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 743822 | |||||
Pool in ground w/ 5 fence Date: April 21, 2016 Value: $70,000Permit type: Building residential permit | Permit status: Issued | Current use: Swimming pool & fence | Permit id: 752477 | |||||
Install gas service in accordance with washington gas plan no. 680585. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 22, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 353097 | |||||
Bore roadway shoulder; dig and backfill trench;install cable and associated equipment in accordance with pepco plan no. 3509807. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 22, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354480 | |||||
Dw permit (residential) remove existing driveway and construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Install private drainage connections. Concrete epoxy non? Shrink grout will be used to patch the drainpipe. Drain pipe will be connected into the county storm drain structure or pipe as directed by the dps inspector. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector.
|