ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Special exception for the partial demolition of the existing attached structure to remove front portion. For the erection of multiple a new semi-detached structure (maximum height not to exceed 38 ft.) creating multiple principle building on the same lot. Size and location as shown on plans. New structure will be use as two (2) vacant commercial spaces on the first floor (use registration permit required prior to occupancy) and multi-family household living (four (4) dwelling units) above. The remaining existing structure will be used as a daycare center. Date: September 19, 2016Client: Dibor Lawrence O Dibor Chinyelu N | Applicant: Lawrence Dibor | Permit type: Appeal | Permit id: 28854 | |||||
Zoning use permit Date: December 27, 2016Client: Dibor Lawrence O Dibor Chinyelu N | Permit status: Completed | Permit id: 710421 | |||||
Special exception for the partial demolition of the existing attached structure to remove front portion. For the erection of multiple a new semi-detached structure (maximum height not to exceed 38 ft.) creating multiple principle building on the same lot. Size and location as shown on plans. New structure will be use as two (2) vacant commercial spaces on the first floor (use registration permit required prior to occupancy) and multi-family household living (four (4) dwelling units) above. The remaining existing structure will be used as a daycare center. Date: September 19, 2016Client: Dibor Lawrence O Dibor Chinyelu N | Applicant: Lawrence Dibor | Permit type: Appeal | Permit status: Granted | Permit id: 28854 | |||||
Selective demolitionof th eexisting 1 story education training facility warehouse. 2). New construction to include a mixed use building containing 2 storefronts on the first floor and 2 apartments on both the second and thrid floor, as well as a daycare facility in the back of the property. 3)the property also includes a driveway leading to a courtyard and te daycare facility. 4) the stories and heights above are broken down into two numbers. The first number is for the mixed usee building while the second is for the day care. Date: December 27, 2016Client: Bor Lawrence O Dibor Chinyelu N | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 27, 2016 | Permit id: 710421 |