Demolition/rebuild Date: March 19, 2013Permit type: Demolition or move p | Permit status: Finaled | Completion date: April 16, 2013 | Current use: Single family dwelling | Permit id: 622123 | |||||
Mechanical permit Date: June 27, 2013Permit status: Finaled | Completion date: November 14, 2013 | Current use: Single family dwelling | Permit id: 639902 | |||||
200amp temp pole Date: December 27, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 621997 | |||||
Demolition/rebuild revision submitted on 3/26/13 - site, structural, architectural (emc) expedited review Date: March 19, 2013 Value: $450,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 622127 | |||||
Install gas service in accordance with washington gas plan no. 186913. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruct Date: August 7, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 298135 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree division permission are
|