Construction of building shell for apm (automated people mover) maintenance and service facility. This is a three-phased submission 1)utilities foundations, 2)superstructure & 3)shell enclosure. No tenant build-out under this application. Building 2 is the apm power substation. This building will be shell only under this permit, apm dbom (design build operate maintain) contractor will provide tenant improvement build-out. Building is intended to house detailed assembly and disassemble processes, maintenance, repair and replacement of components of electric trains. Date: April 10, 2015Permit type: Commercial new const | Permit status: Issued | Permit id: Bld-15-0438803 | |||||
Construction of building shell for apm (automated people mover) maintenance and service facility. This is a three-phased submission 1)utilities/foundations, 2)superstructure & 3)shell enclosure. No tenant build-out under this application. Building 2 is the apm power substation. This building will be shell only under this permit, apm dbom (design build operate maintain) contractor will provide tenant improvement build-out. Building is intended to house detailed assembly and disassemble processes, maintenance, repair and replacement of components of electric trains. Date: July 6, 2015Permit type: Commercial new construction and additions | Permit status: Issued | Expiration date: August 3, 2016 | Current use: Commercial | Permit id: Bld-15-0438803 | |||||
This is a turn key fire alarm system installation for the new automated people mover station #4 this system will be part of the existing fire alarm network at tampa international airport. Please reference master permit bld-15-0440479. Date: May 3, 2016Permit type: Commercial miscellaneous permit | Permit status: Issued | Expiration date: October 30, 2016 | Current use: Commercial | Permit id: Bld-16-0444896 | |||||
We are writing to request a permit revision to tia apm station #4 maintenance & storage facility arch/ mep package submittal bld-15-0440479. The attached conformed revision package incorporates post-permit design revisions required by user (apm dbom operator) requests and coordination issues that have been issued to the field as architects supplemental instructions (asi) packages as follows: asi #1, dated 10/30/2015: primary revisions to the building include relocation of stair #2, revised roof design and resulting storm drainage. This affected architectural and structural sheets and also mechanical (plumbing), electrical (lighting & lightning protection) and fire alarm drawings per the resulting storm drainage, lighting and life safety changes required by the stair and roof changes. Please see attached asi #1 form for revisions to specific sheets attached. Asi #2, dated 11/06/2015: revisions include addition of electrical power to overhead doors in service bay, revision of electrical Date: March 10, 2016Permit type: Building plan revision | Permit status: Complete | Completion date: March 10, 2016 | Current use: Revision | Permit id: Bld-15-0440479- | |||||
Install new above ground fire sprinkler system with (3) standpipes. Date: April 15, 2016Permit type: Commercial miscellaneous permit | Permit status: Issued | Expiration date: October 12, 2016 | Current use: Commercial | Permit id: Bld-16-0444595 | |||||
Secure - we are writing to request a permit revision to tia apm station #4 maintenance & storage facility superstructure and shell package submission, submittal bld-15-0440479. We are proposing deletion of the exterior soffit panels on the underside of the elevated slab and revising the r-value of this elevated slab separating the interior conditioned space from the unconditioned, exterior space beneath. This revision requires modifications to the architectural, structural, electrical and fire suppression system drawings. The superstructure and shell package was submitted conforming to the requirements of the 20 florida building code (fbc) and 20 fbc energy conservation code. As indicated on sheet x1. 1 in the energy code compliance information chart, an r-value equal to or greater than is required for raised floors (refer to table 502. 1. 1. 1(1)). An r-value of 30. 48 was proposed in the design documents for the elevated slab in this area. The build-out for the conditioned spaces in this Date: August 10, 2016Permit type: Building plan revision | Permit status: Complete | Completion date: August 10, 2016 | Current use: Revision | Permit id: Bld-15-0440479- | |||||
Construction of building shell for apm (automated people mover) maintenance and service facility. This is a three-phased submission 1)utilities foundations, 2)superstructure & 3)shell enclosure. No tenant build-out under this application. Building 2 is the apm power substation. This building will be shell only under this permit, apm dbom (design build operate maintain) contractor will provide tenant improvement build-out. Building is intended to house detailed assembly and disassemble processes, maintenance, repair and replacement of components of electric trains. Date: July 6, 2015Permit type: Commercial new construction and additions | Permit status: Issued | Expiration date: August 3, 2016 | Current use: Commercial | Permit id: Bld-15-0438803 | |||||
Owner requested nfp relocate the 6" primary grid main outside their future electric room. Electric room will be protected by others with pre-action and clean agent system at a future date. Date: January 27, 2017Permit type: Building plan revision | Permit status: In process | Current use: Revision | Permit id: Bld-16-0444595- | |||||
We are writing to request a permit revision to tia apm station #4 maintenance & storage facility arch mep package submittal bld-15-0440479. The attached conformed revision package incorporates post-permit design revisions required by user (apm dbom operator) requests and coordination issues that have been issued to the field as architects supplemental instructions (asi) packages as follows: asi #1, dated 10 30 2015: primary revisions to the building include relocation of stair #2, revised roof design and resulting storm drainage. This affected architectural and structural sheets and also mechanical (plumbing), electrical (lighting & lightning protection) and fire alarm drawings per the resulting storm drainage, lighting and life safety changes required by the stair and roof changes. Please see attached asi #1 form for revisions to specific sheets attached. Asi #2, dated 11 06 2015: revisions include addition of electrical power to overhead doors in service bay, revision of electrical Date: March 10, 2016Permit type: Building plan revision | Permit status: Complete | Completion date: March 10, 2016 | Current use: Revision | Permit id: Bld-15-0440479- | |||||
Secure - revised maintenance level per owner architectural direction to delete metal ceiling. The revised concealed pendents to uprights on 1" sprigs protecting unobstructed construction below maintenance level slab. Relocated revised standpipe at stair #2 to match eor plans. Recalculated roof level calculation since standpipe changed and mezzanine level calculation due to revisions. Date: October 13, 2016Permit type: Building plan revision | Permit status: Complete | Completion date: October 26, 2016 | Current use: Revision | Permit id: Bld-16-0444595- | |||||
Tenant improvement interior buildout of the maintenance and service facility for the automated people mover at tampa airport. Work for this permit application only includes work on level 2 (maintenance) and level 3 (mezzanine). Date: November 8, 2016Permit type: Commercial new construction and additions | Permit status: Withdrawn | Completion date: November 16, 2016 | Expiration date: May 15, 2017 | Current use: Commercial | Permit id: Bld-17-0448702 | |||||
Install new above ground fire sprinkler system with (3) standpipes. Date: April 15, 2016Permit type: Commercial miscellaneous permit | Permit status: Revision | Expiration date: July 31, 2017 | Current use: Commercial | Permit id: Bld-16-0444595 | |||||
This is a tenant improvement in the automated people mover maintenance building (apm 4) at t. I. A. It will be installed at the same time as the core. It will be an extension of the building fire alarm system. Please refer to master permit # bld-16-0447619 Date: January 9, 2017Permit type: Commercial miscellaneous permit | Permit status: Issued | Expiration date: July 8, 2017 | Current use: Commercial | Permit id: Bld-17-0449419 | |||||
Secure- tenant improvement interior buildout of the maintenance and service facility for the automated people mover at tampa airport. Work for this permit application only includes work on level 2 (maintenance) and level 3 (mezzanine). Date: November 22, 2016Permit type: Commercial new construction and additions | Permit status: Issued | Expiration date: July 26, 2017 | Current use: Commercial | Permit id: Bld-16-0447619 | |||||
Install fire suppression - master permit #bld-16-0447619 Date: March 22, 2017Permit type: Commercial miscellaneous permit | Permit status: Issued | Expiration date: September 18, 2017 | Current use: Commercial | Permit id: Bld-17-0450804 | |||||
Modify existing wet fire sprinkler system and install new pre-action fire sprinkler systems. Attach to gc permit #bld-16-0447619 Date: February 28, 2017Permit type: Commercial miscellaneous permit | Permit status: Issued | Expiration date: October 23, 2017 | Current use: Commercial | Permit id: Bld-17-0450497 | |||||
Secure- tenant improvement interior buildout of the maintenance and service facility for the automated people mover at tampa airport. Work for this permit application only includes work on level 2 (maintenance) and level 3 (mezzanine). Date: November 22, 2016Permit type: Commercial new construction and additions | Permit status: Issued | Expiration date: December 9, 2017 | Current use: Commercial | Permit id: Bld-16-0447619 | |||||
Asi #11 - structural and architectural revision to the slab. Date: June 12, 2017Permit type: Building plan revision | Permit status: Complete | Completion date: June 16, 2017 | Current use: Revision | Permit id: Bld-15-0440479- | |||||
Reissue: this is a turn key fire alarm system installation for the new automated people mover station #4 this system will be part of the existing fire alarm network at tampa international airport. Please reference master permit bld-15-0440479. Original issue date: 05 03 2016 Date: May 3, 2016Permit type: Commercial miscellaneous permit | Permit status: Issued | Expiration date: December 4, 2017 | Current use: Commercial | Permit id: Bld-16-0444896 | |||||
Temporary c o apm4 due to water line and meter work to be completed Date: August 16, 2017Permit type: Commercial temp certificate of occupancy | Permit status: Complete | Completion date: August 17, 2017 | Expiration date: August 8, 2019 | Current use: Commercial | Permit id: Bld-16-0447619- | |||||
Construction of building shell for apm (automated people mover) maintenance and service facility. This is phase 2 superstructure no tenant build-out under this application. Building 2 is the apm power substation. This building will be shell only under this permit, apm dbom (design build operate maintain) contractor will provide tenant improvement build-out. Building is intended to house detailed assembly and disassemble processes, maintenance, repair and replacement of components of electric trains. Date: September 10, 2015Permit type: Commercial new construction and additions | Permit status: Complete | Completion date: July 26, 2017 | Expiration date: January 29, 2018 | Current use: Commercial | Permit id: Bld-15-0440479 | |||||
Signed and sealed as-built set of plans to match installation in field for fire inspector rodriguez. Date: July 19, 2017Permit type: Building plan revision | Permit status: Complete | Completion date: August 23, 2017 | Current use: Revision | Permit id: Bld-16-0444595- | |||||
Construction of foundation apm (automated people mover) maintenance and service facility. This is a three-phased submission 1)utilities foundations, 2)superstructure & 3)shell enclosure. Building is intended to house detailed assembly and disassemble processes, maintenance, repair and replacement of components of electric trains. Date: July 6, 2015Permit type: Commercial new construction and additions | Permit status: Complete | Completion date: July 24, 2017 | Expiration date: January 24, 2018 | Current use: Commercial | Permit id: Bld-15-0438803 | |||||
Reissue (originally issued 01-09-17) this is a tenant improvement in the automated people mover maintenance building (apm 4) at t. I. A. It will be installed at the same time as the core. It will be an extension of the building fire alarm system. Please refer to master permit # bld-16-0447619 Date: January 9, 2017Permit type: Commercial miscellaneous permit | Permit status: Complete | Completion date: July 31, 2017 | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: Bld-17-0449419 |