Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
At apt 4l, install 1 window guard with screws in the private hall, install 2 window guards with screws in the livingroom, re-install 1 window guard Date: June 14, 2012 Value: $172 Permit type: Gc | Permit id: Ec31545 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: May 18, 2012 Value: $305 Permit type: Delead | Permit id: Ec29758 | |||||
In apt # 1-l bathroom: install 1 w/g and stop. Kitchen: install 1 w/g and stop. Livingroom: reinstall 1 w/g and stop. Hallway: reinstall 1 w/g an Date: January 7, 2000 Value: $223 Permit type: Gc | Permit id: E015309 | |||||
SCORE 100 Equipment work Date: March 7, 2013 Contractor: Sk One Construction Inc Permit status: Permit issued | Permit id: 32072775401 | |||||
In apt # 1-l bathroom: install 1 w g and stop. Kitchen: install 1 w g and stop. Livingroom: reinstall 1 w g and stop. Hallway: reinstall 1 w g an Date: January 7, 2000 Value: $223 Permit type: Gc | Permit id: E015309 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 3, 2012 Permit type: Delead | Permit id: Ec28647 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 10, 2012 Permit type: Delead | Permit id: Ec32587 | |||||
Apt 4l: as per the requirement contract with hpd, provide and install 1 window guard and repair 2 throughout entire apartment. Remove all work re Date: December 27, 2012 Permit type: Gc | Permit id: Ed12409 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: December 29, 2015 Permit type: Delead | Permit id: Eg09691 |