Building Permits at 5432 Ne 24th Ave Portland OR


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 5432 Ne 24th Ave Portland OR over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Final plat to create 3 lots

Permit type: Land use review | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Final plat to create 3 lots

Permit type: Land use review | Permit status: Completed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Final plat to create 3 lots

Permit type: Land use review | Permit status: Mailed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Final plat to create 3 lots

Permit type: Process management | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Final plat to create 3 lots

Permit type: Addressing | Permit status: Not reqd | Completion date: July 6, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: September 30, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Closed | Completion date: May 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: February 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: February 13, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: May 29, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Site development | Permit status: Response sent | Completion date: October 7, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Site development | Permit status: Response sent | Completion date: March 11, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Life safety | Permit status: Response sent | Completion date: February 18, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Fire bureau | Permit status: Response sent | Completion date: March 13, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: Response sent | Completion date: October 10, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: Response sent | Completion date: March 16, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: No concerns | Completion date: February 20, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Transportation | Permit status: Response sent | Completion date: October 16, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Transportation | Permit status: Response sent | Completion date: May 22, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Water bureau review | Permit status: Response sent | Completion date: March 9, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Parks bureau | Permit status: Response sent | Completion date: March 4, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Cesspool decommision
Date:  August 4, 2015

Permit type: Application | Permit status: Approved | Completion date: August 4, 2015 | Permit id: 2015-211839-000
2015/08/040955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Land use review | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Land use review | Permit status: Completed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Land use review | Permit status: Mailed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Routed | Completion date: August 11, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Routed | Completion date: July 24, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Routed | Completion date: August 26, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Satisfied | Completion date: September 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Completed | Completion date: September 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Auditor | Permit status: No concerns | Completion date: July 17, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Addressing | Permit status: Not reqd | Completion date: July 6, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Bds land use services | Permit status: Satisfied | Completion date: September 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Site development | Permit status: Satisfied | Completion date: August 5, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Fire bureau | Permit status: Satisfied | Completion date: August 17, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Environmental services | Permit status: Satisfied | Completion date: July 29, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Transportation | Permit status: Satisfied | Completion date: September 2, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Parks bureau | Permit status: Satisfied | Completion date: August 3, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Plat issuance | Permit status: Signed | Completion date: September 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Plat issuance | Permit status: Completed | Completion date: September 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Plat issuance | Permit status: Completed | Completion date: September 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: September 30, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Closed | Completion date: May 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: February 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: February 13, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: May 29, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Site development | Permit status: Response sent | Completion date: October 7, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Site development | Permit status: Response sent | Completion date: March 11, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Life safety | Permit status: Response sent | Completion date: February 18, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Fire bureau | Permit status: Response sent | Completion date: March 13, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: Response sent | Completion date: October 10, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: Response sent | Completion date: March 16, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: No concerns | Completion date: February 20, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Transportation | Permit status: Response sent | Completion date: October 16, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Transportation | Permit status: Response sent | Completion date: May 22, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Water bureau review | Permit status: Response sent | Completion date: March 9, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Parks bureau | Permit status: Response sent | Completion date: March 4, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Administration | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Drywell
Date:  June 29, 2015

Permit type: Plumbing inspections | Permit status: Approved | Completion date: July 9, 2015 | Permit id: 2015-193969-000
2015/06/290955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Land use review | Permit status: Completed | Completion date: June 23, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Land use review | Permit status: Completed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Land use review | Permit status: Mailed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Routed | Completion date: August 11, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Routed | Completion date: July 24, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Routed | Completion date: August 26, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Satisfied | Completion date: September 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Process management | Permit status: Completed | Completion date: September 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Auditor | Permit status: No concerns | Completion date: July 17, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Addressing | Permit status: Not reqd | Completion date: July 6, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Bds land use services | Permit status: Satisfied | Completion date: September 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Site development | Permit status: Satisfied | Completion date: August 5, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Fire bureau | Permit status: Satisfied | Completion date: August 17, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Environmental services | Permit status: Satisfied | Completion date: July 29, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Transportation | Permit status: Satisfied | Completion date: September 2, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Parks bureau | Permit status: Satisfied | Completion date: August 3, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Plat issuance | Permit status: Signed | Completion date: September 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Plat issuance | Permit status: Completed | Completion date: September 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of the final plat to create 3 lots

Permit type: Plat issuance | Permit status: Completed | Completion date: September 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: September 30, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Closed | Completion date: May 28, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: February 10, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: February 13, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: May 29, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Land use review | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Site development | Permit status: Response sent | Completion date: October 7, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Site development | Permit status: Response sent | Completion date: March 11, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Life safety | Permit status: Response sent | Completion date: February 18, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Fire bureau | Permit status: Response sent | Completion date: March 13, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: Response sent | Completion date: October 10, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: Response sent | Completion date: March 16, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Environmental services | Permit status: No concerns | Completion date: February 20, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Transportation | Permit status: Response sent | Completion date: October 16, 2014 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Transportation | Permit status: Response sent | Completion date: May 22, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Water bureau review | Permit status: Response sent | Completion date: March 9, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Parks bureau | Permit status: Response sent | Completion date: March 4, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
Approval of an adjustment to 33. 266. 1 for parcel 1 to reduce the required number of parking spaces from 1 to 0. Approval of a preliminary plan for a 3-parcel partition, that will result in 3 single dwelling parcels as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use review and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the modified deck to remain on parcel 1; any driveways and off-street vehicle parking areas on the site at the time of the final plat application; the reduced side setbacks allowed under 33. 120. 270. D; the location of the new stormwater facility for the existing house on parcel 1; and any other

Permit type: Administration | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2014-218324-000
0955432 Ne 24th Ave Portland Or
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.