ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New 2 amp service and (1) amp feeder to guard shack. Circuits for general lighting adn receptacle under panel. Date: January 7, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: January 23, 2015 | Permit id: 2015-102049-000 | |||||
Move service Date: January 8, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: January 14, 2015 | Permit id: 2015-102823-000 | |||||
1-13-15 noise complaint - construction noise prior to 7 am. Permit type: Request | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-103987-000 | |||||
Install storm sewer and catch basins to (4) new infiltration basins, install cistern for rainwater harvesting system to connect to future building at se schiller street. No work inside buildings, all site work. Date: January 15, 2015Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104358-000 | |||||
San conn 1of4, 450lf of 18 cipp lined vcp main, approx d=274lf in public sewer easement east of mh acd172 in se center street. Contractor shall build new 6 branch per std p-262 and tap 18 sewer. Contractor verify all depths and locations in field. Date: January 20, 2015Permit type: Intake | Permit status: Closed | Completion date: January 16, 2015 | Permit id: 2015-106613-000 | |||||
1832 ft of water service Date: January 20, 2015Permit type: Intake | Permit status: Closed | Completion date: January 16, 2015 | Permit id: 2015-106626-000 | |||||
New medium voltage feeders, new admin building, new site lighting, (2) new entrance and exit building, new storm water pump station Date: February 6, 2015Permit type: Intake | Permit status: Closed | Completion date: January 23, 2015 | Permit id: 2015-109220-000 | |||||
Construction Date: February 23, 2015Permit type: Intake | Permit status: Complete | Completion date: February 17, 2015 | Permit id: 2015-120656-000 | |||||
San conn 4 of 4, 214lf 8in csp in public sewer easement in vacated se harold row east of mcloughlin. Contractor to install std manhole (p-150) over main approx 170lf east of mh#acn2 approx d=11ft. And provide connection to private 4 pvc pipe from the south side of easement. Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127613-000 | |||||
San conn 2of4, 116lf of 8 pvc main, built under ep9373 in schiller street row. Contractor shall connect to exist branch per std p-262 (apporx depth = 8ft, from new mh) located approximately center of row at easternmost edge. Contractor verify all depths and locations in field. Contractor to coordinate with public works job ep9373. Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127619-000 | |||||
Install sanitary sewer on property, approximately 1 feet Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127623-000 | |||||
San conn 3 of 4, 214lf 8in csp in public sewer easement in vacated se harold row east of mcloughlin. Contractor to install std manhole (p-150) over main approx 170lf east of mh#acn2 approx d=11ft. And provide connection to 8 pvc private pipe from the north side of easement. Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127632-000 | |||||
Manhole on harold st - s. Side easement 565 ft sanitary sewer Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127642-000 | |||||
Mh install harold st - n. Side of easement off of schiller st - 506 ft sanitary sewer Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127648-000 | |||||
Complaint received: brooklyn rail yard noise: container cranes loading and unloading, a piercing beep beep beep at all hours of the night (2 or 4 am not unusual). Intermittent crash sounds as well. Permit type: Request | Permit status: Closed | Completion date: June 1, 2011 | Permit id: 2011-144759-000 | |||||
Complaint received: brooklyn rail yard noise: container cranes loading and unloading, a piercing beep beep beep at all hours of the night (2 or 4 am not unusual). Intermittent crash sounds as well. Permit type: Request | Permit status: Closed | Completion date: September 26, 2014 | Permit id: 2011-144759-000 | |||||
New 384 sf trash enclosure for crew change building Date: December 4, 2012Permit type: Application | Permit status: Approved w/ cond | Completion date: May 1, 2012 | Permit id: 2012-136813-000 | |||||
New 168 sf drivers help center / kiosk building and all site work for redevelopment of uprr brooklyn yards (air compressor building and pad under separate permit 13-1296 co) Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137383-000 | |||||
Revision - deleted construction of working tracks and tracks nos thru 16. This change resulted in minor revision to grading and drainage. Reduced concrete removal areas. Added concrete barrier along western r/w limits and entrance gate. Added concrete gutter around admin pkg lot. Added concrete masonry retaining wall along r/w. Added fencing between admin area and south yard. Entrance portal building gate revised to fence. Crane pad area revised. Dolly pad increased. Added concrete gutter along proposed wall by r/w and added storm drain lines/inlets. Access gate tire shredder and drains removed. Added pier protection detail. South yard next to exit gate layout changed resulting in changes to storm drain layout, pavement areas. Date: May 1, 2015Permit type: Application | Permit status: Approved | Completion date: March 6, 2015 | Permit id: 2012-137383-Rev | |||||
New 1147 sf truck entrance portal Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137388-000 | |||||
New 1147 sf truck exit portal building Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: October 8, 2012 | Permit id: 2012-137392-000 | |||||
New 29 sf truck entrance canopy Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137393-000 | |||||
New 29 sf truck exit canopy Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137394-000 | |||||
New 27,0 gal prefabricated steel storage tank for stormwater runoff Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137396-000 | |||||
New 524 sf building Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137519-000 | |||||
Demo 13,981 sf superintendent bldg Date: December 4, 2012Permit type: Application | Permit status: Approved | Completion date: July 25, 2012 | Permit id: 2012-155899-000 | |||||
Added value revision to include demo of a communication tower connected by a steel beam Date: May 7, 2013Permit type: Application | Permit status: Approved | Completion date: May 7, 2013 | Permit id: 2012-155899-Rev | |||||
Demo 515 sfstorage bldg and tank Date: December 4, 2012Permit type: Application | Permit status: Approved | Completion date: July 25, 2012 | Permit id: 2012-155902-000 | |||||
New trash enclosure for admin building Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: September 7, 2012 | Permit id: 2012-180332-000 | |||||
Installing a 3 amp 480/277 volt temporary service. Date: July 29, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-209096-000 | |||||
One 7. 5-ton crac, five 4-ton split he gas/elec with economizer mixing boxes interlocked with motorized dampers on relief, misc exhausts Date: August 23, 2013Permit type: Intake | Permit status: Closed | Completion date: August 1, 2012 | Permit id: 2012-167715-000 | |||||
Repairing/replacing damaged conduit and conductors due to damage done by backhoe. Faxed Date: January 16, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2013-105623-000 | |||||
Relocating power 6 to new vault from power pole. Relocating power pole and new feeder to signal shack. Faxed Date: February 25, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2013-119857-000 | |||||
Install (1) 2 amp se4rvice and (2) circuits for insley pump station. Date: November 20, 2013Permit type: Intake | Permit status: Closed | Completion date: November 20, 2013 | Permit id: 2013-230118-000 | |||||
1-13-15 noise complaint - construction noise prior to 7 am. Permit type: Request | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-103987-000 | |||||
1-13-15 noise complaint - construction noise prior to 7 am. Permit type: Request | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2015-103987-000 | |||||
Toilet room small separate building. 1 toilet & 1 sink & fd. 26 of water lines. Date: April 23, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: September 30, 2015 | Permit id: 2015-156466-000 | |||||
Installing a 3 amp 480 277 volt temporary service. Date: July 29, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-209096-000 | |||||
New 168 sf drivers help center kiosk building and all site work for redevelopment of uprr brooklyn yards (air compressor building and pad under separate permit 13-1296 co) Date: August 23, 2013Permit type: Application | Permit status: Approved | Completion date: August 24, 2012 | Permit id: 2012-137383-000 | |||||
Revision - deleted construction of working tracks and tracks nos thru 16. This change resulted in minor revision to grading and drainage. Reduced concrete removal areas. Added concrete barrier along western r w limits and entrance gate. Added concrete gutter around admin pkg lot. Added concrete masonry retaining wall along r w. Added fencing between admin area and south yard. Entrance portal building gate revised to fence. Crane pad area revised. Dolly pad increased. Added concrete gutter along proposed wall by r w and added storm drain lines inlets. Access gate tire shredder and drains removed. Added pier protection detail. South yard next to exit gate layout changed resulting in changes to storm drain layout, pavement areas. Date: May 1, 2015Permit type: Application | Permit status: Approved | Completion date: March 6, 2015 | Permit id: 2012-137383-Rev | |||||
One 7. 5-ton crac, five 4-ton split he gas elec with economizer mixing boxes interlocked with motorized dampers on relief, misc exhausts Date: August 23, 2013Permit type: Intake | Permit status: Closed | Completion date: August 1, 2012 | Permit id: 2012-167715-000 | |||||
Repairing replacing damaged conduit and conductors due to damage done by backhoe. Faxed Date: January 16, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2013-105623-000 | |||||
1-13-15 noise complaint - construction noise prior to 7 am. Permit type: Request | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-103987-000 | |||||
1-13-15 noise complaint - construction noise prior to 7 am. Permit type: Request | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2015-103987-000 | |||||
Create two new offices in existing tenant space Date: August 2, 2006Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: September 7, 2006 | Current use: Business | Permit id: 2006-151128-000 |