ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Dumpster temporarily place dumpster within the public right of way. Dumpster location, pavement protection (with plywood) and warning devices such as barricades, traffic cones and/or lights are to be placed as directed by the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Do not block the access to fire hydrant. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by placement of the dumpster. The permittee agrees to hold montgomery county harmless from any liability associated with placement of dumpster in the public right of way. For parking meter issues, contact mc dot division of parking management at 240-777-8793. Date: November 22, 2016Permit type: Public right of way | Permit status: Issued | Current use: Dumpster | Permit id: 355394 | |||||
Demolition/rebuild Date: November 2, 2016Permit type: Demolition or move permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 771841 | |||||
Demolition/rebuild Date: November 2, 2016 Value: $600,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 771845 | |||||
Install gas service in accordance with washington gas plan no. 714204. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 7, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 355228 |